Chapter 6 Communication Requirements
1 Network Requirements
1.1 Insite/Network Connection
The preferred Insite connection uses a broadband modem. This connection requires a
dedicated Ethernet Jack (RJ45) that must be located less than 1 meter (3 feet) from the C1
frontal cabinet
For complete descriptions of the GEHC connectivity solutions, please refer to the Broadband
Solutions catalogue available through your local GEHC sales and service representative.
Connectivity Process and pre-installations checklists are available in the Broadband
Connectivity PIM available through your local GEHC sales and service representative.
InSite requires an Internet Address connecting it to the Innova System. This address must be
available before installing the system. A request form has been defined. For more information,
or contact your GE Healthcare OLC representative.
NOTICE
The C1 frontal cabinet comes equipped with a Firewall unit. The hospital network
must be capable of connecting to this firewall. In the case that it cannot be,
please contact GE Healthcare to discuss alternatives.
Innova
TM
IGS 620, Innova
TM
IGS 630 Preinstallation Manual
Direction 5694389-1-1EN, Revision 2
Chapter 6 Communication Requirements
205
Содержание Innova IGS 620
Страница 2: ...InnovaTM IGS 620 InnovaTM IGS 630 Preinstallation Manual Direction 5694389 1 1EN Revision 2 2...
Страница 207: ......