Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
Illustration 3-2:
The preferred installation method for the Innova LC Positioner or the Omega tables
is through-bolting. The through-bolting method can be used in all seismic zones. If
through-bolting cannot be used, use provided floor anchors instead.
Illustration 3-3: Through–Bolt Supplied (Slab Type Floor Construction)
3.3.2 Floor requirements when using provided floor anchors
The maximum pullout force per provided anchor was calculated assuming:
•
A concrete compression strength of 17.24 MPa at 28 days (which is the minimum
required compression strength).
•
Anchors installed to the required hole depth of 165.1 mm minimum, and
•
Center of anchor hole to concrete edge distance 79.4 mm.
Make sure to obtain data on compression strength of the concrete before using floor anchors.
3.3.3 Pan Type Floor Construction Requirement
For Pan type floor construction, steel channels must be designed by a local structural
engineer to span floor joists. See
.
Chapter 3 Physical Requirements of Room
59