Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
17.3 Procedure
17.3.1 Connection of the Power Distribution Box
Hospital main power must enter from the Top. Correct phase sequence during
installation is very important. Phase failure relays are provided to monitor voltages
less than 85%, loss of a phase, or incorrect phase sequence. Corrections to
the phase sequence must be corrected only at the line side of the main circuit
breaker CB1.
1. Connect the ON/OFF, Remote control and Emergency Power Off devices.
Illustration 6-27:
2. If the Fluoro UPS option is installed, remove the L1A, L2A and L3A jumpers linking the
Power Distribution Block 1 and the Power Distribution Block 2.
Illustration 6-28:
3. Connect the Power distribution cables.