Connect Battery Probes
Battery probes are optional controller peripherals.
See the controller manual and instructions accompanying the probes.
Verify Battery Bus Voltage and Polarity
Step
Action
CAUTION
:
Equipment Damage
Do not install rectifiers before battery bus voltage and polarity has been verified.
Rectifiers and system damage will result from incorrect battery bus polarity.
The damage may not be immediately evident.
1
Verify that the measured voltage matches
the bus label using a meter.
Figure 58 Battery Bus Labels
Connect Load Wiring
WARNING: Shock Hazard and Equipment Damage
Do not install circuit breakers or
load fuses until the load equipment is ready to be
energized.
When a load is ready to be energized
1.
Connect the load to the distribution panel.
2.
Install the circuit breaker of fuse.
CAUTION: Equipment Damage
Ensure Circuit Breakers are in the OFF position prior to installation.
Ensure Fuse Holders are empty prior to installation.
Notes:
1.
Connect the Load Return cable before the Load cable for each load.
The Load Return connection is blocked by the Load cable, if installed.
2.
Follow steps of each section below as appropriate to breakers and fuses to be installed.
3.
Repeat steps of each section as appropriate.
4.
Bolt-in breakers/fuse holders may be factory installed.
5.
Bullet Terminal distribution panels accept Bullet Terminal Circuit Breakers, TPS Fuse Holders, and GMT Fuse
Modules.
6.
GMT Modules must be installed before loads are connected to the GMT Module.
Battery Return
Bus Label
Battery Bus
Label