Chapter 8 • Hydran 201C
i
-1 Installation
8-2
Rev. 6, March 2011
Part 17997
3.
Verify the ac power supply voltage (indicated on the label inside the H201C
i
-1, near
the main terminal block) corresponds to the power source voltage and the value on
the Test Certificate and Data Sheet (for an example, see Figure 6-1 on page 6-4).
There are two possibilities:
• 115 V, corresponding to a 90–132 Vac range from 47 to 63 Hz
• 230 V, corresponding to a 180–264 Vac range from 47 to 63 Hz
4.
Ensure the H201C
i
-1’s serial number (indicated on the right internal side of the
enclosure wall or on the back of the door) corresponds to those indicated on the Test
Certificate and Data Sheet and on the shipping box.
5.
Report any discrepancy to the company supervisor and the General Electric Canada
Customer Service (the coordinates can be found at the bottom of page ii).
Note: Never return equipment without first contacting the General Electric Canada
Customer Service.
8.1.3
Storage
If the Hydran 201C
i
-1 is not installed immediately, it is strongly recommended to store it
in its original shipping box in a safe place. Ensure to cover the door-mounted push-buttons
with the protective caps.
Storage should be at a temperature between 5 and 45 °C (41 and 113 °F) and a non-
condensing, relative humidity between 5 and 95 %; if these limits are to be exceeded, please
contact the General Electric Canada Customer Service (the coordinates can be found at the
bottom of page ii). These restrictions do not apply to transportation.
8.2
VERIFICATION OF OPERATION PRIOR TO INSTALLATION
It is strongly recommended to verify the operation of the Hydran 201C
i
-1 Controller before
installation in the field. The verification confirms that no damage occurred during shipping
and allows the user to become familiar with the H201C
i
-1.
Содержание Hydran 201i
Страница 1: ...GE Energy Services Digital Energy Hydran Instruction Manual 201i System ...
Страница 6: ...Instruction Manual vi Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 8: ...Instruction Manual viii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 22: ...Instruction Manual xxii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 36: ...Chapter 1 Introduction 1 10 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 72: ...Chapter 3 Hydran 201Ci Controllers 3 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 114: ...Chapter 5 Before Installation 5 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 143: ...Installation Part 17997 Rev 6 March 2011 6 29 Figure 6 9 Installing the CPU Module ...
Страница 176: ...Chapter 8 Hydran 201Ci 1 Installation 8 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 190: ...Chapter 9 Communications and Networking 9 14 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 216: ...Chapter 11 Operating the Hydran 201i System 11 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 236: ...Chapter 12 Troubleshooting 12 20 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 244: ...Chapter 13 Maintenance 13 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 254: ...Appendix B Mechanical Drawings B 2 Rev 6 March 2011 Part 17997 Figure B 3 1 5 In Adaptor ...
Страница 255: ...Hydran 201Ti Intelligent Transmitter Part 17997 Rev 6 March 2011 B 3 Figure B 4 1 In Adaptor ...
Страница 262: ...Appendix C Functional Block Diagrams C 4 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 282: ...Appendix F Default Values of the Parameters F 4 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 284: ...Appendix G Unit Conversions G 2 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 298: ...Appendix I Glossary I 12 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 299: ......