The procedure is as follows:
1.
Remove the rubber plugs from the required openings of the H201C
i
-C enclosure.
2.
For each cable being used, install a standard, watertight conduit fitting (not supplied).
Up to eight conduits may be installed (supervisory links, ac power supply).
3.
Mount a conduit to each fitting.
4.
Ground the conduits and/or cable shields at some point. Follow the company
regulations meticulously.
7.3.4
Installing the Supervisory Link Cables
Note: The supervisory link cables have already been run into conduits up to the
Hydran 201Ci-C if the installation of the Hydran 201Ti’s is completed (see Section 6.3.9
on page 6-26).
1.
If required, trim the excess length from the end of the supervisory link cables to be
wired into the H201C
i
-C.
Note: The total maximum length of all supervisory link cables connected to one H201Ci-C
is 1,200 m (4,000 ft).
2.
Ensure the four wires of each cable have been labelled (for identification purposes)
at both ends.
3.
Connect the wires and shield of one cable to one of the four H201C
i
-C’s termination
boards. For wiring details, see Table D-8 on page D-5.
Note: The shield is grounded through a capacitor at the H201Ti end to protect against
radiofrequency interference. Shields must also be directly grounded at the H201Ci-C’s
termination board.
Содержание Hydran 201i
Страница 1: ...GE Energy Services Digital Energy Hydran Instruction Manual 201i System ...
Страница 6: ...Instruction Manual vi Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 8: ...Instruction Manual viii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 22: ...Instruction Manual xxii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 36: ...Chapter 1 Introduction 1 10 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 72: ...Chapter 3 Hydran 201Ci Controllers 3 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 114: ...Chapter 5 Before Installation 5 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 143: ...Installation Part 17997 Rev 6 March 2011 6 29 Figure 6 9 Installing the CPU Module ...
Страница 176: ...Chapter 8 Hydran 201Ci 1 Installation 8 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 190: ...Chapter 9 Communications and Networking 9 14 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 216: ...Chapter 11 Operating the Hydran 201i System 11 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 236: ...Chapter 12 Troubleshooting 12 20 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 244: ...Chapter 13 Maintenance 13 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 254: ...Appendix B Mechanical Drawings B 2 Rev 6 March 2011 Part 17997 Figure B 3 1 5 In Adaptor ...
Страница 255: ...Hydran 201Ti Intelligent Transmitter Part 17997 Rev 6 March 2011 B 3 Figure B 4 1 In Adaptor ...
Страница 262: ...Appendix C Functional Block Diagrams C 4 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 282: ...Appendix F Default Values of the Parameters F 4 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 284: ...Appendix G Unit Conversions G 2 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 298: ...Appendix I Glossary I 12 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 299: ......