Installation
Part 17997
Rev. 6, March 2011
6-27
• A supervisory link cable connected to a H201C
i
-C requires two twisted pairs and an
overall shield.
• If, for special considerations, the H201T
i
’s analog output is used, select a cable with
characteristics similar to the supervisory link cable but with an additional pair of wires.
The procedure is as follows:
1.
Run the supervisory link cable into the conduit up to the H201C
i
Controller, where it
will be connected later.
2.
Ensure all wires are identified.
3.
Connect the cable wires and shield to the H201T
i
’s supervisory link (and analog
output) termination board. For wiring details, see Table D-6 on page D-3.
4.
Connect the analog output wires to the SCADA system.
6.3.10 Installing the Alarms Cable (Facultative)
If the Hydran 201T
i
’s alarms are used, proceed as follows:
1.
Run the alarms cable through the second conduit up to the H201T
i
.
2.
Connect the cable to the H201T
i
’s Alarm Contacts 9-Terminal Block (item 12 in
Figure 2-5 on page 2-9). For wiring details, see Table D-2 on page D-1.
3.
Connect the cable to the SCADA system.
6.3.11 Installing the ac Power Supply Cable
1.
Run the three-wire ac power supply cable into the second conduit up to the
Hydran 201T
i
.
CAUTION
WARNING
The H201Ti’s operation may be affected if wires are not connected
correctly. Be careful when installing and inserting each wire. Be sure
to insert all strands in the terminal; strands that touch two terminals
cause problems. Strip each wire to a maximum of 8 mm before
installing it. Do not leave trims of metallic strands inside the
H201Ti’s enclosure.
Содержание Hydran 201i
Страница 1: ...GE Energy Services Digital Energy Hydran Instruction Manual 201i System ...
Страница 6: ...Instruction Manual vi Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 8: ...Instruction Manual viii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 22: ...Instruction Manual xxii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 36: ...Chapter 1 Introduction 1 10 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 72: ...Chapter 3 Hydran 201Ci Controllers 3 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 114: ...Chapter 5 Before Installation 5 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 143: ...Installation Part 17997 Rev 6 March 2011 6 29 Figure 6 9 Installing the CPU Module ...
Страница 176: ...Chapter 8 Hydran 201Ci 1 Installation 8 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 190: ...Chapter 9 Communications and Networking 9 14 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 216: ...Chapter 11 Operating the Hydran 201i System 11 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 236: ...Chapter 12 Troubleshooting 12 20 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 244: ...Chapter 13 Maintenance 13 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 254: ...Appendix B Mechanical Drawings B 2 Rev 6 March 2011 Part 17997 Figure B 3 1 5 In Adaptor ...
Страница 255: ...Hydran 201Ti Intelligent Transmitter Part 17997 Rev 6 March 2011 B 3 Figure B 4 1 In Adaptor ...
Страница 262: ...Appendix C Functional Block Diagrams C 4 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 282: ...Appendix F Default Values of the Parameters F 4 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 284: ...Appendix G Unit Conversions G 2 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 298: ...Appendix I Glossary I 12 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Страница 299: ......