GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Page 8-70
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-28
BP128 Assy
8-2-28-1
Tools
•
Common Phillips screwdrivers
8-2-28-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-28-3
Removal procedure
1.) To replace the BP128 assy, all PWAs should be removed from the nest box.
2.) Open the Side Left Cover and Side Right Cover. Refer to the
8-2-14 "Right or Left Side Cover" on
.
3.) Open the EMI Cover L and EMI Cover R. Refer to the
8-2-24 "EMI Cover L and R" on page 8-63
.
4.) Remove all PWAs from the nest box.
5.) Open the front cover. Refer to the
8-2-15 "Front Cover" on page 8-50
.
6.) Remove the P3RLY/PI128II Board. Refer to the
8-2-27 "P3RLY/PI128II Assy" on page 8-68
.
7.) Remove the HDD. Refer to the
8-2-43 "SATA HDD Assy" on page 8-93
8.) Unplug all the cable connectors all in BP128 Assy.
9.) Remove a bracket (1) by loosing 2 screws.Refet to
Figure 8-110 "BP128 Assy" on page 8-71
Figure 8-109 PWAs in the nest box