GE Multilin
G60 Generator Protection System
7-9
7 COMMANDS AND TARGETS
7.2 TARGETS
7
If none of these apply, then contact the factory.
•
Latched target message
: No.
•
Description of problem
: An Ethernet connection has failed.
•
How often the test is performed
: Monitored every five seconds.
•
What to do
: Check Ethernet connections. Port 1 is the primary port and port 2 is the secondary port.
•
Latched target message
: No.
•
Description of problem
: The SNTP server is not responding.
•
How often the test is performed
: Every 10 to 60 seconds.
•
What to do
: Check SNTP configuration and network connections.
•
Latched target message
: No.
•
Description of problem
: A discrepancy has been detected between the actual and desired state of a latching contact
output of an installed type “4L” module.
•
How often the test is performed
: Upon initiation of a contact output state change.
•
What to do
: Verify the state of the output contact and contact the factory if the problem persists.
•
Latched target message
: No.
•
Description of problem
: A data item in a configurable GOOSE data set is oscillating.
•
How often the test is performed
: Upon scanning of each configurable GOOSE data set.
•
What to do
: The “xxx” text denotes the data item that has been detected as oscillating. Evaluate all logic pertaining to
this item.
•
Latched target message
: No.
•
Description of problem
: A direct device is configured but not connected.
•
How often the test is performed
: Every second.
•
What to do
: Check direct input and output configuration and wiring.
•
Latched target message
: No.
•
Description of problem
: One or more GOOSE devices are not responding.
MAINTENANCE ALERT:
Port ## Failure
MAINTENANCE ALERT:
SNTP Failure
MAINTENANCE ALERT:
4L Discrepancy
MAINTENANCE ALERT:
GGIO Ind xxx oscill
DIRECT I/O FAILURE:
COMM Path Incomplete
REMOTE DEVICE FAIL:
COMM Path Incomplete
Содержание G60 UR Series
Страница 2: ......
Страница 4: ......
Страница 12: ...xii G60 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Страница 32: ...1 20 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 102: ...3 48 G60 Generator Protection System GE Multilin 3 4 MANAGED ETHERNET SWITCH MODULES 3 HARDWARE 3 ...
Страница 132: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 392: ...5 260 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 418: ...6 26 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 446: ...8 18 G60 Generator Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 452: ...9 6 G60 Generator Protection System GE Multilin 9 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 9 THEORY OF OPERATION 9 ...
Страница 482: ...A 12 G60 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIXA A ...
Страница 604: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIXD D ...
Страница 616: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...
Страница 634: ...x G60 Generator Protection System GE Multilin INDEX ...