![GE FVP110 Скачать руководство пользователя страница 204](http://html.mh-extra.com/html/ge/fvp110/fvp110_maintenance-manual_133072204.webp)
FVP 110 Fieldbus Valve Positioner Manual
188
GE Energy
*1: FF-891 “Foundation
TM
Specification Function Block Application Process Part 2”
Parameters of Transducer Block
Parameters marked with (*1) are automatically set and changed by autotuning.
Parameters marked with (*2) are automatically set and changed by Travel calibration.
51
1051
DEVICE_STA
TUS_7
0
—
Not used in the FVP110.
52
1052
DEVICE_STA
TUS_8
0
—
Not used in the FVP110.
Table 61
Transducer Block Parameters
Relative
Index
Index
Parameter
Name
Default
(factory
setting)
Write
Description
0
2000
Block Header
Block Tag
=O/S
Information about this block, including the
block tag, DD revision, execution time
1
2001
ST_REV
0
—
Incremented when a change is made to the
parameter settings for the resource block to
indicate the revision level of the settings, and
used to see whether or not there is a change in
parameter settings.
2
2002
TAG_DESC
Spaces
Universal parameter storing the description of
the tag
3
2003
STRATEGY
1
Universal parameter used by an upper-level
system to classify the function blocks
4
2004
ALERT_KEY
1
Universal parameter used as a key to identify
the point from which an alert is issued;
normally used by an upper level system to
select alerts to provide to a particular operator
who covers a specific area of the plant.
5
2005
MODE_BLK
O/S
Universal parameter that indicates the block
operation conditions and is composed of actual
mode, target mode, permitted modes, and
normal mode.
Table 60
Resource Block Parameters (Continued)
Relative
Index
Index
Parameter
Name
Default
(factory
setting)
Write
Description
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......