FVP 110 Fieldbus Valve Positioner Manual
172
GE Energy
1 Current: Standard Actuator Signature
2 Current: Extended/High Resolution Actuator Signature
3 Current: Step Response Test
4 Current: Positioner Signature
5 Factory: Standard Actuator Signature (result stored in non-volatile
memory)
6 Record: Standard Actuator Signature (result stored in non-volatile
memory)
NOTE
If the number of the measured data is 20 or more, specify in
SIGN_UPLOAD_POINTER the leading position of the data for
upload. For example, setting 21 in
SIGN_UPLOAD_POINTER uploads the twenty-first through
fortieth data. Refer to the value of SIGN_MEAS_COUNTER,
which indicates the number of data actually measured.
Signatures and Relevant Parameters
The following describes each signature and the relevant parameters.
Standard Signature *1 The standard signature is the fundamental input-to-position valve
characteristic, measured at 10% through 90% of the full stroke in
10% intervals over a round trip. The following is settable in
STD_ACT_SIGN_SET:
❑
Recommended Scan Time [seconds]
❑
Scan Time [seconds]
❑
Deviation Margin [%]
Performing measurements sets the pressure data in
SIGN_DATA_X and the position data (%) in SIGN_DATA_Y.
To save the signature to FVP110 non-volatile memory:
❑
Select 2 (Save as a Factory data) or 3 (Save as record
data) in SIGN_DATA_SAVE and save. The standard
signature previously saved is overwritten.
Save the signature data taken at the installation as a
Factory data
and that of the latest measurement as a
Record data
.
Extended Actuator
Signature *1
The extended actuator signature is the valve input-to-position
characteristics, measured at arbitrary positions within the full
stroke of the valve. As for the positions of measuring, 50 points
can be specified for each valve direction, totaling 100 points. The
following is settable in EXT_ACT_SIGN_SET:
Lower Setpoint [%] (point to start the measurement)
Upper Setpoint [%] (point to finish the measurement)
Recommended Scan Time [seconds]
Содержание FVP110
Страница 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Страница 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Страница 98: ...FVP 110 Fieldbus Valve Positioner Manual 82 GE Energy Figure 47 Double Acting Actuator Dimensions ...
Страница 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Страница 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 114: ...FVP 110 Fieldbus Valve Positioner Manual 98 GE Energy Table 17 View Object for Transducer Block ...
Страница 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Страница 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Страница 118: ...FVP 110 Fieldbus Valve Positioner Manual 102 GE Energy Table 19 View Object for DI1 DI2 Function Block ...
Страница 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Страница 120: ...FVP 110 Fieldbus Valve Positioner Manual 104 GE Energy Table 21 View Object for PID Function Block ...
Страница 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Страница 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Страница 239: ...223 LM Parameter List Link Master Functions ...
Страница 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Страница 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Страница 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Страница 268: ...FVP 110 Fieldbus Valve Positioner Manual 252 GE Energy Figure 84 Checking Position at Which Clamp Should Be Fixed ...
Страница 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Страница 289: ...273 H Customer Maintenance Parts List ...
Страница 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Страница 291: ......