63
K415 Issue No. 1
1
Bleed hose assembly
2
Priming pump
3
Screw-press
4
UUT/system under test
5
UUT bleed valve
6
Isolation valve
O -
Open
C
-
Closed
Figure A2 - Priming/Test Set-up
Bleeding the System (Figure A2)
Before any measurements can be made, the hydraulic system needs to be primed and
bled free of air. During the following operations, prepare for fluid spillage and provide a
suitable receptacle for collecting the spillage.
1.
Prepare for use as detailed on page 62.
2.
Fill a suitable container with clean hydraulic fluid and place the bleed hose assembly
(1) connected to the priming port into the fluid.
3.
Open the UUT bleed valve (5) and, if possible, fit a hose to the bleed point and locate
the hose end in a container of the same hydraulic fluid.
4.
Use the priming pump (2), to pump hydraulic fluid into the instrument and the
connected system. Monitor the hydraulic fluid level, ensuring that the bleed hose
assembly (1) stays below the fluid level and is not allowed to suck in air. Top-up
hydraulic fluid level as necessary.
1
4
2
3
Hydraulic Calibrator Versions Operation
Содержание Druck DPI 610
Страница 1: ...Druck DPI 610 615 Portable Pressure Calibrator Series User manual K415 GE Sensing ...
Страница 2: ......
Страница 10: ...K415 Issue No 1 viii ...
Страница 69: ...59 K415 Issue No 1 Hydraulic Calibrator Versions ...
Страница 70: ...K415 Issue No 1 60 This page intentionally left blank ...
Страница 76: ...K415 Issue No 1 66 This page intentionally left blank ...
Страница 77: ...67 K415 Issue No 1 Low Pressure Calibrator Versions ...
Страница 78: ...K415 Issue No 1 68 This page intentionally left blank ...
Страница 81: ...71 K415 Issue No 1 C Closed O Open Figure B2 Test Connections Low Pressure Calibrator Versions ...
Страница 87: ...77 K415 Issue No 1 Appendix 1 DATA LOG FILE EXAMPLE ...
Страница 88: ...K415 Issue No 1 78 This page intentionally blank ...