5
Safety
5
5..6
6 H
Ha
azza
arrd
dss
5
5..6
6..1
1 H
He
ea
avvyy L
Liiffttiin
ng
g
C
Ca
au
uttiio
on
n
Heavy machine parts are handled regularly when operating the Arcam EBM System. Use the
provided loading trolley at all times and whenever needed call for lifting assistance. There is a
serious risk of injury if these items are handled incorrectly!
C
Ca
au
uttiio
on
n
To avoid trip hazard, make sure to park the trolley in its allocated space, see Pre-Installation
Guide.
C
Ca
au
uttiio
on
n
To eliminate the risk of dropping the build tank or hoppers when using the trolley, make sure that:
•
the trolley forks are fully inserted in the fork channels before lifting.
• the build tank or hoppers are fully inserted into the chamber before the trolley is released.
Arcam EBM provides a trolley to be used when moving heavy machine parts. The
trolley lift bracket is specially designed (differs between the EBM Machines) to han-
dle the build tank and the hoppers. A reload tray can be used to assist the removal
of small builds from the EBM Machine.
Procedures for proper use are found in the separate Trolley Manual supplied by
Svenema.
20
01
IM-710429
en-GB
Содержание ArcamEBM Spectra H
Страница 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Страница 2: ...This page is intentionally left blank...
Страница 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Страница 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Страница 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Страница 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...
Страница 56: ...7 Installation 7 7 4 4 1 1 2 2 L Lo ow we er r C Ca ab blle e P Po or rt t 52 01 IM 710429 en GB...