September 2004
1-8
Installation
Wiring the Totalizer/
Frequency Output
The Model AT868 also provides a second output per channel
(designated as Output B and D) that can be configured as a totalizer
or frequency output using the Instrument Data Manager (IDM)
software.
Like the analog outputs, these outputs can also be configured
independently. Typically, Output B is used for Channel 1 and
Output D is used for Channel 2; however, outputs can be configured
to measure either channel.
Figure 1-1 below shows a sample wiring diagram of a totalizer and
frequency output circuit.
Figure 1-1: Totalizer/Frequency Output Wiring
!WARNING!
DO NOT CONNECT EXTERNAL POWER TO THE
PULSE/FREQUENCY OUTPUT TERMINALS.
To wire the totalizer/frequency outputs, complete the following steps:
1.
Follow the instructions on page 1-4 to prepare the unit before you
connect power.
2.
Refer to Figure 1-4 on page 1-14 for the location of the
appropriate terminal blocks and wire the totalizer/frequency
outputs as shown. Secure the cable clamp.
Note:
Analog outputs 1 and 2 in the wiring diagram correspond to
analog outputs B and D in the AT868 software.
!WARNING!
To meet CE Mark requirements, all cables must be installed
as described in Appendix B,
CE Mark Compliance
.
3.
Do one of the following:
•
Proceed to the next section to continue wiring the Model AT868
flow transmitter.
•
Reinstall the plastic shroud, replace the front cover on the
enclosure and tighten the screws.
+5V
200
OUT
RTN
IN
Common
Model AT868
Pulse/Frequency Counter
Содержание AquaTrans AT868
Страница 8: ...Chapter 1 ...
Страница 24: ...Chapter 2 ...
Страница 60: ...Chapter 3 ...
Страница 66: ...Chapter 4 ...
Страница 72: ...Chapter 5 ...
Страница 77: ...Chapter 6 ...
Страница 88: ...Chapter 7 ...
Страница 98: ...Chapter 8 ...
Страница 106: ...Appendix A ...
Страница 112: ...Appendix B ...
Страница 113: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 LVD Compliance B 2 ...
Страница 116: ...Appendix C ...
Страница 117: ...Data Records Site Data C 1 ...
Страница 122: ...Appendix D ...
Страница 123: ...Measuring P and L Dimensions Measuring P and L D 1 ...
Страница 126: ...Appendix E ...
Страница 127: ...Service Record Introduction E 1 Data Entry E 1 Diagnostic Parameters E 3 ...
Страница 129: ...September 2004 E 2 Service Record Table E 1 Service Record cont Date Description of Service Performed By ...
Страница 131: ...Appendix F ...