Installation
1-1
September 2004
Introduction
To ensure safe and reliable operation of the Model AT868 Flowmeter,
the system must be installed and programmed in accordance with the
guidelines established by GE Infrastructure Sensing engineers. Those
guidelines, explained in detail in this chapter, include the following
topics:
•
Unpacking the Model AT868 system
•
Selecting suitable sites for the electronics enclosure and the
flowcell/transducers
•
Installing the flowcell/transducers
Note:
See the enclosed
Liquid Transducer Installation Guide
(916-055)
for detailed instructions on transducer installation.
•
Installing the electronics enclosure
•
Wiring the electronics enclosure
!WARNING!
Be sure to follow all applicable local safety codes and
regulations for installing electrical equipment. Consult
company safety personnel or local safety authorities to
verify the safety of any procedure or practice.
!ATTENTION EUROPEAN CUSTOMERS!
To meet CE Mark requirements, all cables must be installed
as described in Appendix B,
CE Mark Compliance
.
Содержание AquaTrans AT868
Страница 8: ...Chapter 1 ...
Страница 24: ...Chapter 2 ...
Страница 60: ...Chapter 3 ...
Страница 66: ...Chapter 4 ...
Страница 72: ...Chapter 5 ...
Страница 77: ...Chapter 6 ...
Страница 88: ...Chapter 7 ...
Страница 98: ...Chapter 8 ...
Страница 106: ...Appendix A ...
Страница 112: ...Appendix B ...
Страница 113: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 LVD Compliance B 2 ...
Страница 116: ...Appendix C ...
Страница 117: ...Data Records Site Data C 1 ...
Страница 122: ...Appendix D ...
Страница 123: ...Measuring P and L Dimensions Measuring P and L D 1 ...
Страница 126: ...Appendix E ...
Страница 127: ...Service Record Introduction E 1 Data Entry E 1 Diagnostic Parameters E 3 ...
Страница 129: ...September 2004 E 2 Service Record Table E 1 Service Record cont Date Description of Service Performed By ...
Страница 131: ...Appendix F ...