
5.4.2
Sample pump
Introduction
This section describes how to prime inlets and purge Sample pumps S9 and S9H.
Overview
The procedure consists of the following steps:
1 Prime all sample inlet tubing to be used during the run
2 Purge the Sample pump
3 Validate purge
4 End the run
Prime sample inlets
Follow the instructions below to fill all sample inlet tubing, to be used in the run, with appropriate buffer
or solution. Skip steps three and four if no sample inlet valve is used.
Action
Step
Make sure that all sample inlet tubing that is to be used during the method run is immersed
in the correct buffers.
1
Make sure that the waste tubing connected to Injection valve port W2 is immersed in a
waste vessel.
2
Open the System Control module.
3
168
ÄKTA pure User Manual 29119969 AB
5 Operation
5.4 Prime inlets and purge pump heads
5.4.2 Sample pump
Содержание AKTApure
Страница 1: ...ÄKTA pure User Manual ...
Страница 2: ...Page intentionally left blank ...
Страница 520: ...Page intentionally left blank ...
Страница 521: ...Page intentionally left blank ...