Model 940 Reader
Installation Manual
22
Testing the reader
Follow the steps below to verify that the reader is working
correctly.
1. Check the following:
•
Proper cabling and electrical connections exist
between the reader and the microcontroller.
•
The microcontroller is properly configured and the
proper version of firmware is installed.
•
The reader is properly mounted.
2. Close the tamper switch by joining the reader and
backplate so that the tamper alarm is not activated or by
ensuring the reader is securely mounted.
3. Apply power to the reader and verify that the power-on
self test completes as described in the section
.
4. Verify that the reader is not beeping and that the red LED
is not flashing. If either of these two conditions exist,
refer to the section
.
5. Verify proper reader operation as follows:
a.
Select a known good test badge. Be sure that the
badge is properly enrolled in the host system.
b. Ensure that the door is closed and latched. This is the
first step to verify that the reader strike relay is wired
properly.
WARNING: It is important to ensure all connections are made
prior to applying power.
Содержание 940
Страница 14: ...Model 940 Reader Installation Manual 10 Figure 3 Model 940 reader Gang box mounting...
Страница 15: ...Mounting the reader 11 Figure 4 Model 940 reader Direct wall mounting...
Страница 20: ...Model 940 Reader Installation Manual 16 Figure 6 Supervised F 2F wiring diagram...
Страница 22: ...Model 940 Reader Installation Manual 18 Figure 7 Unsupervised F 2F wiring diagram...
Страница 24: ...Model 940 Reader Installation Manual 20 Figure 8 Wiegand wiring diagram...
Страница 32: ...Model 940 Reader Installation Manual 28 Notes...
Страница 33: ...Regulatory approvals 29 Notes...
Страница 34: ...Model 940 Reader Installation Manual 30 Notes...