![GE 5669999 Скачать руководство пользователя страница 521](http://html.mh-extra.com/html/ge/5669999/5669999_basic-service-manual_128530521.webp)
GE
DRAFT
V
OLUSON
™ P8 / V
OLUSON
™ P6
DIRECTION 5723243, R
EVISION
6
DRAFT (M
AY
23, 2018)
B
ASIC
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-173
Section 8-54
Functional Checks after FRU replacement (Debrief Guidelines)
1.) Perform required Functional and/or Leakage Current tests based upon the FRU being replaced.
2.) Clarify the scripts to debrief a Service Dispatch using your pole's dispatch tool.
Use this script in the Service Comments when debriefing a Service Dispatch.
For a replaced FRU
, use the following debrief script:
Proprietary Service Manual, Voluson™ P8 / Voluson™ P6, Revision Voluson™ P8 / Voluson™ P6,
Section [fill in appropriate section]. Equipment passed all required tests and is ready for use.
And, if testing leaking current
, use the following text.
Proprietary Service Manual, Voluson™ P8 / Voluson™ P6, Revision Voluson™ P8 / Voluson™
P6, Section [fill in appropriate section]. Leakage Current meets allowable limits. Equipment
passed all required tests and is ready for us.