GE H
EALTHCARE
PROPRIETARY TO GE
D
IRECTION
5394227, 12
LOGIQ S8/LOGIQ E8 S
ERVICE
M
ANUAL
4 - 48
Section 4-5 - Application Turnover Check List
Section 4-5
Application Turnover Check List
Complete these checks before returning the scanner to the customer for use:
4-5-1
Software Configuration Checks
Section 4-6
Power supply test and adjustments
4-6-1
Power Supply Test Procedure
Run the System Voltage test. Refer to
4-6-2
Power Supply Adjustment
There are no adjustments on the power supplies. The DC Power is self-regulated. If a voltage is outside
the specified range, it means that something is wrong, either with the power supply itself or with a unit
connected to that specific power outlet.
Table 4-4
Software Configuration Checks
STEP
TASK
CHECK (
)
1.
Check Date and Time setting
2.
Check that Location (Hospital Name & Department) is
correct
3.
Check Language settings
4.
Check assignment of Printer Keys
P1
P2
P3
5.
Check that all of the customer’s options are correctly
installed
Содержание 5418099
Страница 11: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL ix ZH CN KO ...
Страница 12: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL x ...
Страница 16: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL xiv This page was intentionally left blank ...
Страница 32: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 16 ...
Страница 176: ...GE HEALTHCARE PROPRIETARY TO GE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 3 98 Section 3 16 Paperwork ...
Страница 416: ...GE HEALTHCARE DIRECTION 5394227 REVISION 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL Index 4 ...
Страница 417: ......