GE
Direction 5370626-100, Revision 18 LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
4-2
Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1
Power On/Boot Up
After AC/DC is connected correctly to the scanner, the power is applied to the scanner. When the
Control panel
Power On/Off
key is pressed once, the System starts.
4-3-1-1
Scanner Power On
Lower the handle. Plug the AC adapter output connector into the system DC input port (located on the
system’s rear panel) with the arrow side upward. Plug the AC adapter power cord into a grounded,
protective earth outlet.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The covers
are required for safe operation, good system performance and cooling purposes.
NOTICE
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable on
the system.
Figure 4-32 connect AC adapter
Signed
Date
TAG
&
LOCKOUT
UP
UP