2.

 

Installation 

 

Prior to installing the valve, clean the pipeline of all foreign matter such as dirt, spatters (welding chips), scale, 

oil or grease. Install the valve in the pipeline so that the fluid flows in the direction indicated by the flow arrows 

attached to the body, or the fluid flows from "IN" toward "OUT" marked at the connection point. 

When securing the lower flange to the pipeline, press the seat ring against the body until it touches the flange 

surface of the pipeline. The lower flange and the pipeline pinch the seat ring and the pipeline’s gasket which is 

prepared in advance, and tighten the pipeline bolts rigidly. 

If the valve is installed in a horizontal position, be sure to take the support from the yoke or other part of the 

actuator. 

In case of the extension type bonnet, do not apply insulation to the extended portion. 

 

Provide the required air tubing for the signal pressure and air supply, and the electrical wiring to the 

positioner. Make sure no air leaks from the air pipeline. 

 

 

3.

 

Maintenance 

When the control valve needs to be disassembled for inspection, cleaning or polishing the valve seat, follow 

the procedures described below. 

It explains the following procedure as an example of the attached drawing (MNS-148001). 

 

3.1.

 

Disassembly 

Shut off all air supplies, disconnect the tubing for the air supply and the positioner signal pressure, and 

the air tubing from the volume tank. 

To disassemble the valve, it must be removed from the piping. Bring a chain block over the valve to 

remove it from the piping for disassembly and reinstall it after reassembly. 

 

1)

 

Run a strong rope through the actuator yoke and remove the valve retaining bolts from the piping 

while slightly pulling the valve upward. 

If the valve is installed in a horizontal position, also run a rope around the body so that no lopsided 

force is exerted on the valve, when disconnecting the valve from the pipeline. 

 

2)

 

Seat ring (12) and gasket (11) can be taken apart, after the valve body is removed from the pipeline. 

At this time, pay attention not to be damaged with the seat ring. 

 

3)

 

Remove the positioner linkage from the split clamp (18) which connects the piston rod (19) of actuator 

and the plug (13) of the body side. 

 

4)

 

Loosen the nut (16) or bolt (26) of the split clamp (18) in order to remove the split clamp (18). 

Take the record on the depth of insertion of the stem and the position of the split clamp so that they 

can be reassembled to the same dimension. 

 

5)

 

Remove the seat ring (12) first from the bottom of the body. The actuator can also be removed by 

loosening the drive nut (5) which connects the body (10) and the yoke (14). However, in case of the 

stud and nut type connection that connects the yoke to the body by the stud (23) and nut (24), loosen 

the nut (24) to remove the actuator from the body. 

 

Remove the packing flange (3) and the packing follower (4), after loosening and removing the stud nut 

(2) which have tightened the packing flange. In the case of keeping connecting the valve body and the 

yoke, the packing flange can be passed through the space between the bottom end of the piston rod 

Содержание Masoneilan 73000 Series

Страница 1: ...GE Data Classification Public GE Oil Gas 73000Series Masoneilan Sweep Angle Control Valves Models XX 73471 Instruction Manual ...

Страница 2: ...HE SITE AND THE PARTICULAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN CONNECTION WITH INSTALLATION OPERATION OR MAINTENANCE SHOULD FURTHER INFORMATION BE DESIRED OR SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COVERED SUFFICIENTLY FOR THE CUS...

Страница 3: ...2 Installation _____________________________________________________ 6 3 Maintenance____________________________________________________ 6 3 1 Disassembly ______________________________________________ 6 3 2 Polishing the Valve Seat _____________________________________ 7 3 3 Reassembly_______________________________________________ 7 3 4 Packing Box_______________________________________________ ...

Страница 4: ...nintended stresses on the product The specific operating conditions will also impact the useful life of the product Consult the factory for guidance on specific applications if required prior to installation Warranty Items sold by General Electric are warranted to be free from defects in materials and workmanship for a period of one year from the date of shipment provided said items are used accor...

Страница 5: ...degraded process system performance that can lead to injury or death Total compliance with all DANGER WARNING and CAUTION notices is required for safe operation This is the safety alert symbol It alerts you to potential personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death Indicates a potentially hazardous situation which if not avoided could re...

Страница 6: ...o disassemble the valve it must be removed from the piping Bring a chain block over the valve to remove it from the piping for disassembly and reinstall it after reassembly 1 Run a strong rope through the actuator yoke and remove the valve retaining bolts from the piping while slightly pulling the valve upward If the valve is installed in a horizontal position also run a rope around the body so th...

Страница 7: ...and the seat ring 2 Set the guide bushing 7 toward the packing box bottom of the body 10 3 Insert the plug 13 from the bottom of the body 10 Set the seat ring without the gasket Stand up the body 4 Install the packings 6 packing spacer 8 and lantern ring 9 leaded by the stem of plug 13 and yet the amount of packings and the order of packings are specified by each valve When installing the packings...

Страница 8: ...wiring With the above re assembly is completed but you must confirm the valve function by checking the valve actuation valve opening etc prior to start up 3 4 Packing box Maintenance of the packing box is a routine work The sealing performance of packing is kept by compression of packing Compression is obtained by evenly tightening the packing flange stud nut 2 for the packing flange 3 but pay att...

Страница 9: ... 2015 General Electric Company All rights reserved Masoneilan 73000 Series control valves Instruction Manual 9 4 Drawing and Parts References ...

Страница 10: ...10 GE Oil Gas 2015 General Electric Company All rights reserved Notes ...

Страница 11: ...11 GE Oil Gas 2015 General Electric Company All rights reserved Notes ...

Страница 12: ... 55 7921 Moscow Phone 7 495 585 1276 Fax 7 495 585 1279 SAUDI ARABIA Phone 966 3 341 0278 Fax 966 3 341 7624 SINGAPORE Phone 65 6861 6100 Fax 65 6861 7172 SOUTH AFRICA Phone 27 11 452 1550 Fax 27 11 452 6542 SOUTH CENTRAL AMERICA AND THE CARIBBEAN Phone 55 12 2134 1201 Fax 55 12 2134 1238 SPAIN Phone 34 93 652 6430 Fax 34 93 652 6444 UNITED ARAB EMIRATES Phone 971 4 8991 777 Fax 971 4 8991 778 UNI...

Отзывы: