L60 Line Phase Comparison System
GE Multilin
5.4 FLEXLOGIC
5 SETTINGS
5
ELEMENT:
Synchrocheck
SYNC 1 DEAD S OP
SYNC 1 DEAD S DPO
SYNC 1 SYNC OP
SYNC 1 SYNC DPO
SYNC 1 CLS OP
SYNC 1 CLS DPO
SYNC 1 V1 ABOVE MIN
SYNC 1 V1 BELOW MAX
SYNC 1 V2 ABOVE MIN
SYNC 1 V2 BELOW MAX
Synchrocheck 1 dead source has operated
Synchrocheck 1 dead source has dropped out
Synchrocheck 1 in synchronization has operated
Synchrocheck 1 in synchronization has dropped out
Synchrocheck 1 close has operated
Synchrocheck 1 close has dropped out
Synchrocheck 1 V1 is above the minimum live voltage
Synchrocheck 1 V1 is below the maximum dead voltage
Synchrocheck 1 V2 is above the minimum live voltage
Synchrocheck 1 V2 is below the maximum dead voltage
SYNC 2
Same set of operands as shown for SYNC 1
ELEMENT:
Teleprotection
channel tests
TELEPRO CH1 FAIL
TELEPRO CH2 FAIL
TELEPRO CH1 ID FAIL
TELEPRO CH2 ID FAIL
TELEPRO CH1 CRC FAIL
TELEPRO CH2 CRC FAIL
TELEPRO CH1 PKT LOST
TELEPRO CH2 PKT LOST
Channel 1 failed
Channel 2 failed
The ID check for a peer relay on channel 1 has failed
The ID check for a peer relay on channel 2 has failed
CRC detected packet corruption on channel 1
CRC detected packet corruption on channel 2
CRC detected lost packet on channel 1
CRC detected lost packet on channel 2
ELEMENT:
Teleprotection
inputs/outputs
TELEPRO INPUT 1-1 On
TELEPRO INPUT 1-16 On
TELEPRO INPUT 2-1 On
TELEPRO INPUT 2-16 On
Flag is set, Logic =1
Flag is set, Logic =1
Flag is set, Logic =1
Flag is set, Logic =1
ELEMENT:
Thermal overload
protection
THERMAL PROT 1 PKP
THERMAL PROT 1 OP
Thermal overload protection 1 picked up
Thermal overload protection 1 operated
ELEMENT
Trip output
TRIP 3-POLE
TRIP 1-POLE
TRIP PHASE A
TRIP PHASE B
TRIP PHASE C
TRIP AR INIT 3-POLE
TRIP FORCE 3-POLE
TRIP OUTPUT OP
TRIP Z2PH TMR INIT
TRIP Z2GR TMR INIT
Trip all three breaker poles
A single-pole trip-and-reclose operation is initiated
Trip breaker pole A, initiate phase A breaker fail and reclose
Trip breaker pole B, initiate phase B breaker fail and reclose
Trip breaker pole C, initiate phase C breaker fail and reclose
Initiate a three-pole reclose
Three-pole trip must be initiated
Any trip is initiated by the trip output
Phase distance zone 2 timer is initiated by the trip output
Ground distance zone 2 timer is initiated by the trip output
ELEMENT
Trip bus
TRIP BUS 1 PKP
TRIP BUS 1 OP
Asserted when the trip bus 1 element picks up.
Asserted when the trip bus 1 element operates.
TRIP BUS 2...
Same set of operands as shown for TRIP BUS 1
ELEMENT:
Wattmetric zero-
sequence
directional
WATTMETRIC 1 PKP
WATTMETRIC 1 OP
Wattmetric directional element 1 has picked up
Wattmetric directional element 1 has operated
WATTMETRIC 2...
Same set of operands as per WATTMETRIC 1 above
FIXED OPERANDS
Off
Logic = 0. Does nothing and may be used as a delimiter in an equation list;
used as ‘Disable’ by other features.
On
Logic = 1. Can be used as a test setting.
INPUTS/OUTPUTS:
Contact inputs
Cont Ip 1 On
Cont Ip 2 On
Cont Ip 1 Off
Cont Ip 2 Off
(will not appear unless ordered)
(will not appear unless ordered)
(will not appear unless ordered)
(will not appear unless ordered)
INPUTS/OUTPUTS:
Contact outputs,
current
(from detector on
form-A output only)
Cont Op 1 IOn
Cont Op 2 IOn
(will not appear unless ordered)
(will not appear unless ordered)
INPUTS/OUTPUTS:
Contact outputs,
voltage
(from detector on
form-A output only)
Cont Op 1 VOn
Cont Op 2 VOn
(will not appear unless ordered)
(will not appear unless ordered)
Cont Op 1 VOff
Cont Op 2 VOff
(will not appear unless ordered)
(will not appear unless ordered)
Table 5–16: L60 FLEXLOGIC OPERANDS (Sheet 7 of 9)
OPERAND TYPE
OPERAND SYNTAX
OPERAND DESCRIPTION
Содержание L60
Страница 10: ...x L60 Line Phase Comparison System GE Multilin TABLE OF CONTENTS ...
Страница 57: ...GE Multilin L60 Line Phase Comparison System 2 27 2 PRODUCT DESCRIPTION 2 3 SPECIFICATIONS 2 ...
Страница 58: ...2 28 L60 Line Phase Comparison System GE Multilin 2 3 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Страница 100: ...3 42 L60 Line Phase Comparison System GE Multilin 3 3 DIRECT INPUT AND OUTPUT COMMUNICATIONS 3 HARDWARE 3 ...
Страница 482: ...6 26 L60 Line Phase Comparison System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 554: ...10 8 L60 Line Phase Comparison System GE Multilin 10 2 BATTERIES 10 MAINTENANCE 10 ...
Страница 674: ...B 110 L60 Line Phase Comparison System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 704: ...C 30 L60 Line Phase Comparison System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Страница 720: ...E 10 L60 Line Phase Comparison System GE Multilin E 1 PROTOCOL APPENDIX E E ...
Страница 732: ...F 12 L60 Line Phase Comparison System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 742: ...H 8 L60 Line Phase Comparison System GE Multilin H 3 WARRANTY APPENDIX H H ...