![GE Multilin C60 UR series Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/ge-multilin/c60-ur-series/c60-ur-series_instruction-manual_3953950027.webp)
GE Multilin
C60 Breaker Protection System
1-15
1 GETTING STARTED
1.3 ENERVISTA UR SETUP SOFTWARE
1
1.3.5 CONNECTING TO THE C60 RELAY
1.
Open the Display Properties window through the Site List tree as shown below:
2.
The Display Properties window will open with a status indicator on the lower left of the EnerVista UR Setup window.
3.
If the status indicator is red, verify that the Ethernet network cable is properly connected to the Ethernet port on the
back of the relay and that the relay has been properly setup for communications (steps A and B earlier).
If a relay icon appears in place of the status indicator, than a report (such as an oscillography or event record) is open.
Close the report to re-display the green status indicator.
4.
The Display Properties settings can now be edited, printed, or changed according to user specifications.
Refer to chapter 4 in this manual and the EnerVista UR Setup Help File for more information about the
using the EnerVista UR Setup software interface.
QUICK ACTION HOT LINKS
The EnerVista UR Setup software has several new quick action buttons that provide users with instant access to several
functions that are often performed when using C60 relays. From the online window, users can select which relay to interro-
gate from a pull-down window, then click on the button for the action they wish to perform. The following quick action func-
tions are available:
•
View the C60 event record.
•
View the last recorded oscillography record.
•
View the status of all C60 inputs and outputs.
•
View all of the C60 metering values.
•
View the C60 protection summary.
842743A3.CDR
Communications status indicators:
Green = OK
Red = No communications
UR icon = report is open
Quick action hot links
Expand the site list by double-clicking
or selecting the +/– box.
NOTE
Содержание C60 UR series
Страница 2: ......
Страница 4: ......
Страница 11: ...GE Multilin C60 Breaker Protection System xi TABLE OF CONTENTS INDEX...
Страница 12: ...xii C60 Breaker Protection System GE Multilin TABLE OF CONTENTS...
Страница 32: ...1 20 C60 Breaker Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1...
Страница 50: ...2 18 C60 Breaker Protection System GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2...
Страница 98: ...3 48 C60 Breaker Protection System GE Multilin 3 4 MANAGED ETHERNET SWITCH MODULES 3 HARDWARE 3...
Страница 128: ...4 30 C60 Breaker Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4...
Страница 390: ...8 18 C60 Breaker Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8...
Страница 394: ...9 4 C60 Breaker Protection System GE Multilin 9 1 FAULT LOCATOR 9 THEORY OF OPERATION 9...
Страница 516: ...D 10 C60 Breaker Protection System GE Multilin D 1 OVERVIEW APPENDIXD D...
Страница 528: ...E 12 C60 Breaker Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E...