5-148
F60 Feeder Protection System
GE Multilin
5.5 FLEXLOGIC
5 SETTINGS
5
ELEMENT
Breaker failure
BKR FAIL 1 RETRIPA
BKR FAIL 1 RETRIPB
BKR FAIL 1 RETRIPC
BKR FAIL 1 RETRIP
BKR FAIL 1 T1 OP
BKR FAIL 1 T2 OP
BKR FAIL 1 T3 OP
BKR FAIL 1 TRIP OP
Breaker failure 1 re-trip phase A (only for 1-pole schemes)
Breaker failure 1 re-trip phase B (only for 1-pole schemes)
Breaker failure 1 re-trip phase C (only for 1-pole schemes)
Breaker failure 1 re-trip 3-phase
Breaker failure 1 timer 1 is operated
Breaker failure 1 timer 2 is operated
Breaker failure 1 timer 3 is operated
Breaker failure 1 trip is operated
BKR FAIL 2
Same set of operands as shown for BKR FAIL 1
ELEMENT
Breaker restrike
BRK RESTRIKE 1 OP
BRK RESTRIKE 1 OP A
BRK RESTRIKE 1 OP B
BRK RESTRIKE 1 OP C
Breaker restrike detected in any phase of the breaker control 1 element
Breaker restrike detected in phase A of the breaker control 1 element
Breaker restrike detected in phase B of the breaker control 1 element
Breaker restrike detected in phase C of the breaker control 1 element
ELEMENT:
Breaker control
BREAKER 1 OFF CMD
BREAKER 1 ON CMD
BREAKER 1
Φ
A BAD ST
BREAKER 1
Φ
A INTERM
BREAKER 1
Φ
A CLSD
BREAKER 1
Φ
A OPEN
BREAKER 1
Φ
B BAD ST
BREAKER 1
Φ
B INTERM
BREAKER 1
Φ
B CLSD
BREAKER 1
Φ
B OPEN
BREAKER 1
Φ
C BAD ST
BREAKER 1
Φ
C INTERM
BREAKER 1
Φ
C CLSD
BREAKER 1
Φ
C OPEN
BREAKER 1 BAD STATUS
BREAKER 1 CLOSED
BREAKER 1 OPEN
BREAKER 1 DISCREP
BREAKER 1 TROUBLE
BREAKER 1 MNL CLS
BREAKER 1 TRIP A
BREAKER 1 TRIP B
BREAKER 1 TRIP C
BREAKER 1 ANY P OPEN
BREAKER 1 ONE P OPEN
BREAKER 1 OOS
Breaker 1 open command initiated
Breaker 1 close command initiated
Breaker 1 phase A bad status is detected (discrepancy between
the 52/a and 52/b contacts)
Breaker 1 phase A intermediate status is detected (transition from one
position to another)
Breaker 1 phase A is closed
Breaker 1 phase A is open
Breaker 1 phase B bad status is detected (discrepancy between
the 52/a and 52/b contacts)
Breaker 1 phase B intermediate status is detected (transition from one
position to another)
Breaker 1 phase B is closed
Breaker 1 phase B is open
Breaker 1 phase C bad status is detected (discrepancy between
the 52/a and 52/b contacts)
Breaker 1 phase C intermediate status is detected (transition from one
position to another)
Breaker 1 phase C is closed
Breaker 1 phase C is open
Breaker 1 bad status is detected on any pole
Breaker 1 is closed
Breaker 1 is open
Breaker 1 has discrepancy
Breaker 1 trouble alarm
Breaker 1 manual close
Breaker 1 trip phase A command
Breaker 1 trip phase B command
Breaker 1 trip phase C command
At least one pole of breaker 1 is open
Only one pole of breaker 1 is open
Breaker 1 is out of service
BREAKER 2 to 4
Same set of operands as shown for BREAKER 1
ELEMENT:
Broken conductor
BROKEN CONDUCT 1 OP
BROKEN CONDUCT 1 PKP
Asserted when the broken conductor 1 element operates
Asserted when the broken conductor 1 element picks up
BROKEN CONDUCT 2 to 4
Same set of operands as shown for BROKEN CONDUCTOR 1
ELEMENT
Cold load pickup
COLD LOAD 1 OP
COLD LOAD 2 OP
Cold load pickup element 1 has operated
Cold load pickup element 2 has operated
ELEMENT:
Digital counters
Counter 1 HI
Counter 1 EQL
Counter 1 LO
Digital counter 1 output is ‘more than’ comparison value
Digital counter 1 output is ‘equal to’ comparison value
Digital counter 1 output is ‘less than’ comparison value
Counter 2 to 8
Same set of operands as shown for Counter 1
ELEMENT:
Digital elements
Dig Element 1 PKP
Dig Element 1 OP
Dig Element 1 DPO
Digital Element 1 is picked up
Digital Element 1 is operated
Digital Element 1 is dropped out
Dig Element 2 to 48
Same set of operands as shown for Dig Element 1
ELEMENT:
Sensitive directional
power
DIR POWER 1 STG1 PKP
DIR POWER 1 STG2 PKP
DIR POWER 1 STG1 DPO
DIR POWER 1 STG2 DPO
DIR POWER 1 STG1 OP
DIR POWER 1 STG2 OP
DIR POWER 1 PKP
DIR POWER 1 DPO
DIR POWER 1 OP
Stage 1 of the directional power element 1 has picked up
Stage 2 of the directional power element 1 has picked up
Stage 1 of the directional power element 1 has dropped out
Stage 2 of the directional power element 1 has dropped out
Stage 1 of the directional power element 1 has operated
Stage 2 of the directional power element 1 has operated
The directional power element has picked up
The directional power element has dropped out
The directional power element has operated
DIR POWER 2
Same set of operands as DIR POWER 1
Table 5–18: F60 FLEXLOGIC OPERANDS (Sheet 2 of 8)
OPERAND TYPE
OPERAND SYNTAX
OPERAND DESCRIPTION
Содержание F60
Страница 10: ...x F60 Feeder Protection System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 F60 Feeder Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 138: ...4 28 F60 Feeder Protection System GE Multilin 4 2 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 454: ...5 316 F60 Feeder Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 500: ...7 14 F60 Feeder Protection System GE Multilin 7 1 COMMANDS 7 COMMANDS AND TARGETS 7 ...
Страница 508: ...8 8 F60 Feeder Protection System GE Multilin 8 2 FAULT LOCATOR 8 THEORY OF OPERATION 8 ...
Страница 522: ...10 12 F60 Feeder Protection System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Страница 660: ...B 116 F60 Feeder Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 706: ...E 10 F60 Feeder Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Страница 718: ...F 12 F60 Feeder Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 728: ...H 8 F60 Feeder Protection System GE Multilin H 2 ABBREVIATIONS APPENDIX H H Z Impedance Zone ...
Страница 730: ...H 10 F60 Feeder Protection System GE Multilin H 3 WARRANTY APPENDIX H H ...