background image

 Installation

16

T-EA-5100-1-GB-07-08

4.2

System setup with cooler in side flow

Notes

Installation and start-up must only be undertaken 
by trained persons. Damage due to improper han-
dling is not included in the guarantee terms.

The machine is delivered in fully assembled condi-
tion. It must not have suffered damage in transit.

Please make certain that the rotor shaft can be 
rotated by hand. If this is not the case, inform our 
service staff.

For erection and handling, attach the machine only 
to securely installed eye bolts.

For use in a potentially explosive atmosphere,
all parts of the equipment must satisfy the
requirements for the zone in which they are
used. Note that it may be necessary to provide
equipotential bonding between the equipment
and the truck.
The safe operation of the vacuum pump in a
potentially explosive atmosphere requires that
all safety instructions in our operating instruc-
tions and complementary instructions are
strictly observed.

Fig. 4.2

Components of a system with liquid ring pump – Cooler in side flow

21

12

15

2

15

18

20

18

13

17

4

5

3

6

5

7

1

14

19

9

14

15

16

10

11

8

min

max

Details see page 17

1

Liquid ring pump

2

Vacuum filter

3

Venting line 

4

Non-return valve

5

Bellow

6

Safety valve

7

Pressure gauge

8

Thermometer

9

Operating water tank

10

Four-way directional control 
valve 

11

Safety dome and float valve

12

Vehicle tank

13

Operating water cooler

14

Water stop valve

15

Drain valves (see Fig. 4.4)

16

Safety bowl with float valve

17

Flexible mounting

18

Vacuum gauge

19

Floating switch

20

Pump

21

Water inlet for filling system

22

Leak water return line to suc-
tion side (optional)

Содержание AQUALINE 1200

Страница 1: ...Installation Instructions AQUALINE 1200 T EA 5100 1 GB 07 08...

Страница 2: ......

Страница 3: ...3 Point of installation and fastening 18 4 4 Connections and piping 18 4 5 Protection against intake of dirt and residue 19 4 5 1 Suction line 19 4 5 2 Vacuum filter 19 4 5 3 Safety dome 19 4 5 4 Safe...

Страница 4: ...Table of contents 4 T EA 5100 1 GB 07 08...

Страница 5: ...These Operating Instructions contain all required infor mation and have been written for those in charge of the unit The machine will give smooth service for a long time provided these Instructions a...

Страница 6: ...l volume becomes smaller As a result of this the enclosed air is compressed and pushed out of the pressure outlet The cells are charged and drained through openings in the housing cover located on the...

Страница 7: ...ure power consumption on shaft m3 h barg kW at 1000 min 1 650 0 0 18 at 1500 min 1 1 050 0 0 38 at 1800 min 1 1 220 0 0 57 At 1 000 mbar absolute intake pressure volume flow rate final gauge pressure...

Страница 8: ...ditional ventilation G 1 1 2 Betriebswasser Anschlu G 1 1 2 Connection for the liquidring fluid G 1 1 2 Betriebswasser Entleerung G 3 4 Drain for the liquidring fluid G 3 4 536 5 21 122 475 18 701 644...

Страница 9: ...e and prop shaft by Vee belt whereby the Vee belt pulley is installed on the free shaft end by pneumatic clutch By hydromotor by diesel engine or electric motor by flexible clutch For more details see...

Страница 10: ...Technical data 10 T EA 5100 1 GB 07 08...

Страница 11: ...ns preventing damage to the machine Symbol for potentially explosive atmosphere Here the symbol draws attention to provisions or information which must be observed if the machine is used in a potentia...

Страница 12: ...the pressure gauge vacuum gauge reading On the vehicle Close the stop slide valve Bleed or vent the pressure line between the system and the stop slide valve Relieve elevated pressure manually at the...

Страница 13: ...move transport safeguards where provided 3 2 Storage Store the machine in a dry and heated room until in stallation Remove the covers on suction and pressure openings only at the time of actual instal...

Страница 14: ...Transport 14 T EA 5100 1 GB 07 08...

Страница 15: ...18 15 16 6 7 3 4 8 1 9 5 19 12 15 14 10 11 20 min max Details see page 17 1 Liquid ring pump 2 Vacuum filter 3 Venting line 4 Non return valve 5 Bellow 6 Safety valve 7 Pressure gauge 8 Thermometer 9...

Страница 16: ...tential bonding between the equipment and the truck The safe operation of the vacuum pump in a potentially explosive atmosphere requires that all safety instructions in our operating instruc tions and...

Страница 17: ...n line to suction side R 1 8 connection Fig 4 3 Components of a system with liquid ring pump Cooler in main flow detail 15a1 15b 15c 15a2 15a1 Drain valve for the liquid ring fluid 15a2 Drain valve fo...

Страница 18: ...achine The various possibilities of the suction and pressure line connections are illustrated in Fig 4 5 for machines of clockwise and counter clockwise rotation see also Fig 1 1 The suction and press...

Страница 19: ...he liquid level directly sufficient calming space is available the filter element does not dip into the liquid also filters with non absorbing texture become satu rated due to the capillary action of...

Страница 20: ...am the pressure socket For this install a pipe coupling R 1 2 The immersion depth of the thermometers must be equivalent to one half the diameter of the pipe The indicating range of the thermometers m...

Страница 21: ...id ring pump requires a constant supply of operating fluid For this the casing cover of the machine have a connec tion see dimension sheet If the piping has sufficiently low resistance depending on pi...

Страница 22: ...rops The axial thrust of the drive must not be trans ferred to the rotor shaft Install the drive components on the rotor shaft using the available thread M16 Do not attempt to install the drive compon...

Страница 23: ...ect when the ready installed and tensioned belt can be deflected by the pressure of the thumb by 16 to 20 mm for every 1000 mm axial distance Vee belt drive with electric motor is not allowed because...

Страница 24: ...l screws loosely 2 Push the pulley with the bush on the shaft align and uniformly tighten the screws Removal 1 Take out the screws install one as a forcing screw in the half thread hole in the bush an...

Страница 25: ...rts T EA 5100 1 GB 07 08 25 Start up Operation Maintenance Spare parts 5 Start up Operation Maintenance Spare parts Information on start up operation mainte nance and replacement parts lists have been...

Страница 26: ...Start up Operation Maintenance Spare parts 26 T EA 5100 1 GB 07 08...

Страница 27: ...Heat to be dissipated 21 I Installation 15 Installation of the Vee belt drive 23 Intake 19 Intake pressure 7 Intended purpose 11 Isothermal 6 L Liquid ring machines 6 Liquid Ring Pump 5 Lubricating p...

Страница 28: ...ical data 7 Transport 13 Transport safeguards 13 Type code 6 U Use for intended purpose 11 V Vacuum 7 Vacuum filter 19 20 Vacuum gauge 20 Vee belt 23 Vee belt tensioning 23 venting valve 9 Volume flow...

Страница 29: ...Index T EA 5100 1 GB 07 08 29...

Страница 30: ...l information contact your local representative or Gardner Denver Drum Ltd PO Box 178 Springmill Street Bradford West Yorkshire UK BD5 7YH Tel 44 0 1274 718100 Fax 44 0 1274 718101 Email wittig sales...

Страница 31: ...T EA 5100 1 GB 07 08 31...

Страница 32: ...32 T EA 5100 1 GB 07 08...

Отзывы: