Series 9800 Field Installation
Series 9800 to TopKAT Cabling
Page 112
MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
Series 9800 to TopKAT Cabling
The interconnection of the 9800 to the TopKAT requires a single RS-485 communication
cable. See
“Communication Requirements” on page 21
for wiring considerations.
Figure 8-3: RS-485 Communication Cable
Switch Settings
In order for the 9800 to communicate to the TopKAT via RS-485, the switch settings on the
9800 CPU must be as follows:
Refer to Section 5 of one of the following for switch settings, access, and location:
• MDE-4340 Series 9800Q Pumps and Dispensers Installation/Operation Manual
• MDE-4341 Series 9800A Pumps and Dispensers Installation/Operation Manual
Switch
Function
Position/Setting
SW1-1
Baud Rate Switch
Open (9600 baud)
SW1-2
Mode Switch
Open (on-line)
SW1-8
RS-485 Pump Stop Detection
Closed (disabled)
SW2-1 through SW2-4
Address
Closed (address 1)
Содержание TopKAT
Страница 1: ...TopKAT Fuel Management System Installation Manual MDE 4319A formerly C35754...
Страница 141: ......