Installation of the Gasboy 9820 Pump Interface Kit

Installation of the Gasboy 9820 Pump Interface Kit

Installing this kit involves DC wiring to the Fuel Management System. Refer to 

MDE-4567 

9120K & 9820K Series AST Pumps Installation and Operation Manual

, and your Fuel 

Management System Installation Manual before proceeding.

To install the Gasboy 9820 Pump Interface Kit, proceed as follows:

1

Turn off the circuit breakers that supply power to the MICRO and PUMP feeds.

2

Unlock the door and loosen the two screws. Tilt the top of the door out, then lift up to remove 
it.

Figure 1: Removing the Door

Loosen the Screws

Unlock 
the 
Door

Содержание 9820

Страница 1: ...llation of the kit Flat tip Screwdriver Cross tip Screwdriver Standard Socket set Parts List The following table lists the parts included in the Pump Interface Kits Sr No Description Part Number Quant...

Страница 2: ...n and Operation Manual Gasboy Atlas Pumps Dispensers MDE 4652 Atlas 9800 Electronics Field Installation Instructions Gasboy Atlas Pumps Dispensers Abbreviations and Acronyms Term Description DEF Diese...

Страница 3: ...lations must be followed Failure to install inspect maintain or service this equipment in accordance with these codes regulations and standards may lead to legal citations with penalties or affect the...

Страница 4: ...n IMPORTANT Oxygen may be needed at scene if gasoline has been ingested or inhaled Seek medical advice immediately Lockout Tagout Lockout Tagout covers servicing and maintenance of machines and equipm...

Страница 5: ...m Refer to MDE 4567 9120K 9820K Series AST Pumps Installation and Operation Manual and your Fuel Management System Installation Manual before proceeding To install the Gasboy 9820 Pump Interface Kit p...

Страница 6: ...Assembly Loosen the Screws Tag the Wires 4 Note down the wiring or tag all the wires that are connected to the terminal blocks Remove all the wires from the terminal blocks 5 If the model 9820 Pump co...

Страница 7: ...ed wire in position 1 Secure the terminal block using the 8 32 hardware Figure 4 Installing the Terminal Block Chassis Cable 8 32 Hardware 9 Carefully route the cable and install the connector on P1 o...

Страница 8: ...fer to MDE 4652 Atlas 9800 Electronics Field Installation Instructions The table below shows the jumper settings and terminal block positions to connect at the bottom of the register based on the conf...

Страница 9: ...puts from a single pulser Figure 5 Dual channel Single hose Pulse out I F REMOTE REGISTER Notes 1 All wiring and conduit runs must conform with all building fire codes all Federal State and Local code...

Страница 10: ...and are for identification purposes only Use of these names logos and brands does not imply endorsement 2022 GASBOY 7300 West Friendly Avenue Post Office Box 22087 Greensboro North Carolina 27420 Phon...

Отзывы: