GTX 335 w/GPS Installation Guidance
Rev. 1
Page 3-2
3.1 Pre-Installation Information
NOTE
Always use common avionics installation practices. Refer to FAA Advisory Circulars
(ACs) AC 43.13-1B, AC 43.13-2B, or later approved revisions.
Complete the applicable pre-installation checklist in section 1.5.
Installation planning steps:
1. Complete an electrical load analysis on the aircraft to make sure that the aircraft electrical system
can carry the GTX electrical load.
2. Determine the installation location for the GTX.
3. Make sure that the mounting rack is sufficient for the selected location.
4. Complete a weight and balance to make sure that the location is in permitted limits.
Refer to section 4.
5. Determine cable routing.
6. Make sure that the interfaced equipment is sufficient and that correct approval is possible.
7. Any other necessary modifications.
8. Prepare the mounting rack for installation. Refer to section 4
9. Plan the post-installation checkout prior to closing out the work area. Refer to section 7.
Содержание GTX 335 w GPS
Страница 1: ...190 00734 17 March 2017 Revision 1 GTX 335 w GPS Installation Guidance From STC SA01714WI ...
Страница 56: ...190 00734 17 GTX 335 w GPS Installation Guidance Rev 1 Page 4 4 Figure 4 2 Panel Cutout Detail for GTX 335 ...
Страница 96: ...190 00734 17 GTX 335 w GPS Installation Guidance Rev 1 Page A 2 Figure A 2 GTX 3X5 Panel Mount Rack Assembly ...
Страница 116: ......