G300 Installation Manual – Post Installation Checkout and Calibration Procedures
Page 9-25
190-00921-01
Revision A
NOTE
The Magnetometer Calibration Procedure must consistently report “CALIBRATION
SUCCESSFUL / SITE IS CLEAN” in both the clockwise and counter-clockwise
directions for the site to be considered acceptable. More than one failure out of ten
attempts in a given direction would be sufficient reason to conclude the site is not
acceptable.
A site that is used repeatedly to perform the Magnetometer Calibration Procedure should be re-evaluated
every 12 months, and after any significant construction or placement of magnetic objects (above or below
ground) within 50 meters of the location.
Содержание GMU 44
Страница 1: ...190 00921 01 March 2009 Revision A G300 Installation Manual ...
Страница 36: ...Page 4 8 G300 Installation Manual GSU 73 Revision A 190 00921 01 This page intentionally left blank ...
Страница 44: ...Page 6 4 G300 Installation Manual Antennas Revision A 190 00921 01 This page intentionally left blank ...
Страница 94: ...Page 10 12 G300 Installation Manual Troubleshooting Revision A 190 00921 01 This page intentionally left blank ...