G1000 Supplemental Maintenance Manual
Page 4-4
Textron Nav III Series
Revision 3
190-02128-04
4.3 Maintenance Intervals
Table 4-1 shows systems and items, installed by this STC, which must undergo tests or checks
at specific intervals. If the interval is shown in flight time as well as calendar months, the first
interval reached should be used as the limit.
IMPORTANT
!
The tolerance for inspection times is the same as that stated in 5-10-00 of
the Cessna Maintenance Manual applicable to the airframe.
The intention of Garmin is to align this maintenance program as best as possible with the
existing Cessna Nav III inspection program. For a complete description of the Cessna
inspection program, refer to the Cessna Maintenance Manuals listed in Table 1-1.
For equipment not listed here, refer to the G1000 Nav III Line Maintenance Manual.
Table 4-1, Maintenance Intervals
Item
Description/Procedure
Manual
Section No.
Interval
G1000 Equipment
GDU 1054B PFD and
MFD (Qty 2) or
GDU 1050 PFD and
MFD (Qty 2
Removal & Replacement
On Condition
GTX 335R or GTX
345R Transponder
Removal & Replacement
On Condition
Special Inspection - Perform GTX 335R,
GTX 345R test.
24 Calendar Months
GSU 75 ADAHRS
Removal & Replacement
On Condition
Magnetic variation database update.
On Condition
Special Inspection
– Perform Air Data Test.
24 Calendar Months
GDL 69A SXM
Removal & Replacement
On Condition
G1000 Redundant
Connection Check
Verify PRI and SEC power sources for PFD,
GIA 1, and GSU.
Verify secondary paths for ADAHRS, engine
parameters and GPS data.
Verify the operation of PFD and MFD
Ethernet connections.
Verify ARINC connection between GSU 1
and MFD.
Verify DISPLAY BACKUP button function.
24 Calendar Months
G1000 Accessories
Configuration Module
Replacement
Removal & Replacement.
On Condition
G1000 Lightning Protection
Electrical Bonding
Test
Perform the electrical bonding resistance
check of G1000 equipment.
24 Calendar Months
Содержание G1000 NXi