8
|
www.gd-elmorietschle.com
© Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
Safety
2.5 Personal qualifications and training
• Ensure that people entrusted with working on
the machine have read and understood these
operating instructions before starting work,
particularly the safety instructions for installation,
commissioning, maintenance and inspection
work.
• Manage the responsibilities, competence and
monitoring of staff
• all work must only be carried out be technical
specialists:
• Installation, commissioning, maintenance
and inspection work
• Working with electricity
•
personnel being trained to work on the ma-
chine must be supervised by technical special-
ists only
2.6 Safety-conscious work
The following safety regulations apply in addition
to the safety instructions and intended use listed in
these instructions:
• Accident prevention regulations, safety and op-
erating regulations
• the standards and laws in force
2.7 Safety notes for the operator
• hot parts of the machine must not be accessible
during operation or must be fitted with a guard
• People must not be endangered by the free
extraction or discharge of pumped media
• Risks arising from electrical energy must be
eliminated.
Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
Tel. 071 918 60 60, Mail: [email protected]