4
|
www.gd-elmorietschle.com
© Gardner Denver Schopfheim GmbH
Preface
1
Foreword
1.1 Principles
These Operating Instructions:
• Are part of the central vacuum unit with a vacuum pump C-VLR 1000 VSD and control circuit for the
setpoint pressure
• Describe the safe and proper use in all life phases
• Must be available at the place of application.
The other applicable documents of the central vacuum unit must be available at the place of application as
well.
Figures presented in these Operating Instructions serve for better understanding and can deviate from the
components installed. This does not influence the validity of the details set out in the instructions.
1.2 Target group
The target group for these instructions is technically trained personnel.
1.3 Supplier documentation and accompanying documents
Document
Contents
No.
Supplier documentation
Operating Instructions
BA 1880
Circuit diagram of control unit
ZS1195918
Declaration of Conformity
C 0101
Declaration of no-objection
7.7025.003.17
Other applicable documents
Operating Instructions
BA 880-80
Connection diagram
(is in the cover of the frequency converter)
–
Operating instructions of the frequency converter
610.00260.01.00
Operating Instructions - solenoid valve
–
Spare parts list
Spare parts documents
E 1880
Info sheet
Storage guideline for machines
I 150
Info sheet
Storage guideline for lubricants
I 100
Manufacturer’s declaration
EU Directive 2011/65/EU (RoHS II)
—
1.4 Abbreviations
Fig. Figure
C-VLR claw vacuum pump
m
3
/h
Pumping capacity
XD
Vacuum pump with increased water vapour compatibility
VSD
Variable Speed Drive (frequency converter)
1.5 Directives, standards, laws
See Declaration of Conformity.
Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
Tel. 071 918 60 60, Mail: [email protected]