19
www.gd-elmorietschle.com
© Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
|
Commissioning and decommissioning
6.2 Decommissioning/ storing
Stop the machine
a) Switch the machine off.
b) If available close the cut off device in the suction
and pressure pipe.
c) Disconnect the machine from the electricity
source.
d) Depressurise the machine:
Open the pipes slowly.
The pressure reduces slowly.
e) Remove the pipes and hoses.
f) Drain condensate from the silencer
(design “XD”).
g) Seal the connections for suction and discharge
nozzles with adhesive foil.
see also Section 3.2.1, Page 11
6.3 Re-commissioning
a) Check the condition of the machine (cleanliness,
cabling etc.).
For installation see Section 5 Page 14
For commissioning see Section 6.1 Page 17