GAT Access 6100 Terminal Series
Electrical Connections
www.gantner.com
HB_GAT-ACCESS6100--EN_14
41
4.5
Checklist for Final Installation
After installing and configuring the GAT Access 6100, fill out the following checklist to ensure that every necessary
step has been performed and the GAT Access 6100 is ready to be put into operation.
Some points in the Installation section are not necessary for the GAT Access 6100 Enrollment Station.
Installation:
Cable between device rear part and front part connected to both parts
Housing closed and sealed
Power supply connected
Interface connected
Host/server is running (for online mode)
RFID Reader tested (hold data carrier next to scan field)
Configuration:
Latest software installed in the GAT Access 6100
Network parameters set (IP address, network name, subnet mask, DNS)
Correct time set in the GAT Access 6100
Functional settings set (see chapter "5.4. Configuration Settings" and "GAT Config Manager" manual)
Site-key of the GAT Access 6100 is set correctly
Содержание GAT ACCESS 6100
Страница 10: ...GAT Access 6100 Terminal Series Table of Contents 10 HB_GAT ACCESS6100 EN_14 www gantner com ...
Страница 18: ...GAT Access 6100 Terminal Series General Information 18 HB_GAT ACCESS6100 EN_14 www gantner com ...
Страница 34: ...GAT Access 6100 Terminal Series Installation 34 HB_GAT ACCESS6100 EN_14 www gantner com ...
Страница 42: ...GAT Access 6100 Terminal Series Electrical Connections 42 HB_GAT ACCESS6100 EN_14 www gantner com ...
Страница 80: ...GAT Access 6100 Terminal Series Operation 80 HB_GAT ACCESS6100 EN_14 www gantner com ...
Страница 84: ...GAT Access 6100 Terminal Series Updating the GAT Access 6100 84 HB_GAT ACCESS6100 EN_14 www gantner com ...
Страница 92: ...GAT Access 6100 Terminal Series Troubleshooting FAQ 92 HB_GAT ACCESS6100 EN_14 www gantner com ...