G&G CYGG-080 Скачать руководство пользователя страница 11

7

SUBSCRIPTIONS

ABOUT THE 

AGREEMENT

Declaration of conformity is supplied in separate documentation, delivered with 

the cyclone

with a separator.

3

ǀ

 SAFETY INFORMATION

 GENERAL 

INFORMATION

It is primarily the responsibility of the operator to ensure their personal safety 

when operating the cyclone.

a person designated by the operator. 

The manufacturer is not responsible for 

personal injury or damage to the equipment and environmental damage caused 

by not using and operating it in accordance with the instructions for use and 

applicable safety regulations.

Cyclone separators are designed in accordance with international standards and 

regulations  applicable  to  the  manufacture  of  such  equipment.  The  electrical 

components (if any) of the separator shall comply with international regulations 

on protection against dangerous contact voltages. All electrical elements
either have the appropriate cover prescribed by the standard or are located in 
enclosed spaces whose cover meets the regulations of these standards.

OBLIGATIONS OF 

THE OPERATOR

A company that implements cyclone in its technology, or

the operator must ensure the following:

- must clearly define the scope of responsibilities and competencies of the 

personnel designated

for installation and connection of the cyclone to the technology

- before putting the cyclone into operation, it must ensure that all those who 

come into contact with it can thoroughly familiarise themselves with the 

contents of the instructions for use

- must ensure the spatial arrangement of the cyclone so as not to endanger the 

operation and activities of personnel operating the surrounding equipment

- must take care to protect the health of the personnel assigned to the 

installation or maintenance

cyclone and assign them appropriate personal protective equipment (PPE)

STAFF 

REQUIREMENTS

Qualification of personnel for cyclone installation

:

Mechanical education - a knowledgeable person, i.e. a person with appropriate 

technical education, training and/or experience to recognise and avoid the risks 

that may occur when handling and installing a cyclone.

Qualification of personnel for electrical connections:

Education  in  the  electrical  field  according  to  the  relevant  legislation  of  the 

country of the operator, knowledge of the control system technology used.

Содержание CYGG-080

Страница 1: ...CYCLONE SEPARATOR Instructions for use...

Страница 2: ...Manual version v4 Date created 2023 11 08...

Страница 3: ...NTS 7 PROHIBITED ACTIVITIES 7 safety instructions for operation and maintenance 8 RESIDUAL RISKS 8 4 INSTALLATION AND COMMISSIONING 10 WORKING ENVIRONMENT 10 OPERATING SPACE 10 AVAILABILITY 10 placeme...

Страница 4: ...structions in this manual to ensure not only ease of use but also optimum use and longevity of the equipment Do not operate the equipment until you are thoroughly familiar with all the instructions pr...

Страница 5: ...ABOUT THE INSTRUCTION 1...

Страница 6: ...ht of the equipment supplied is indicated on the equipment s nameplate Lift the load with the lifting device and transport it to the designated unpacking or storage location The delivered equipment ma...

Страница 7: ...pecified above Furthermore it is forbidden to operate them with components other than those with which they were supplied Cyclone separators must not be operated in a different power range than that s...

Страница 8: ...mple model of a cyclone The supplied models consist of the same components differing only in size 1 Cyclone body cylindrical part 5 Input flange 2 Cyclone body conical part 6 Output flange 3 Expansion...

Страница 9: ...ed or removed The selection of a particular model of cyclone separator its features and equipment is a matter of commercial negotiation between the manufacturer and the operator and this manual does n...

Страница 10: ...6 TECHNICAL DATA EXIT CONCENTRATION The guaranteed dust removal rate is between 70 95 depending on the type of dust and the extraction conditions LABELS ON FACILITIES Production label...

Страница 11: ...ompany that implements cyclone in its technology or the operator must ensure the following must clearly define the scope of responsibilities and competencies of the personnel designated for installati...

Страница 12: ...the nature of the work to be performed such as flame resistant and dielectric work suits steel toed work boots gloves helmets safety glasses ear protectors and respirators depending on local condition...

Страница 13: ...they are risks that remain even when all preventive and protective measures have been considered and implemented HAZARD Electric shock during installation maintenance or servicing of electrical parts...

Страница 14: ...Explosion due to non compliance with the maximum temperature of filtered particulates in the case of explosive dusts or mixtures PROTECTION The model of the filter unit is designed for the environmen...

Страница 15: ...material according to the operator s internal regulations or legislation valid in the country of installation of the filter unit 2 Visually check if any parts of the unit have been damaged during tra...

Страница 16: ...parts conductively connected The unit shall be prevented from unexpected start up according to the applicable national standards of the country of operation and shall be equipped with a lockable shut...

Страница 17: ...with the filter unit switched off Regularly check the insulation condition of all cables and the grounding condition In case of any damage contact the electrical maintenance personnel immediately Che...

Страница 18: ...the filter outlet Dirt leaks through the seal Check the tightening of the fixing plates Residual drift value TZL is too high Low extraction power and poor air rotation inside the cyclone and thus low...

Страница 19: ...e to determine the lifetime of the cyclone in general However before disposing of the cyclone and its parts render them unusable When disposing of the unit parts the instructions of the manufacturers...

Страница 20: ...RRANTY COVERS hidden defects in the material demonstrable design defects Defects covered by the warranty must be reported in writing to the manufacturer s service department Special cases can only be...

Страница 21: ...ent handling by unprofessional intervention by connecting or reconnecting to the wrong type or voltage of electricity normal mechanical wear and tear etc Other warranty conditions can be agreed in the...

Страница 22: ...g the dust container P 1 X B2 Inspection of the inner part of the cyclone and removal of sediments 1 X B3 Checking the cyclone hopper flanges for leaks 1 X B4 Inspection and repair of corroded parts o...

Страница 23: ...15...

Страница 24: ...G G filtration CZ s r o Hrub nova 1903 9 664 51 lapanice Czech Republic...

Отзывы: