QUICK-START GUIDE
Load/Power Supply Interface (LPI1010)
High Voltage EIS Test System
Страница 1: ...QUICK START GUIDE Load Power Supply Interface LPI1010 High Voltage EIS Test System...
Страница 2: ...rdware Installation and Con guration Install the LPI1010 D sub Module Connect the LPI1010 D sub Module to the Cell Cable connector on the Interface 1010 s front panel and hand tighten the jackscrews I...
Страница 3: ...est Connect both Voltage Sense Cables to the electrode contacts of your DUT The red connector is for the positive lead the black connected to the negative contact Afterwards connect the power supply t...
Страница 4: ...1010 Check if any software updates are required 5 Press the Con gure button to open the LPI Con guration Entry 6 Correctly enter all parameters in the LPI Con guration Window for your Electronic Load...
Страница 5: ...fety enclosure back on and secure again before continuing 3 Connect the LPI Voltage Sense Cables to the Calibration Cell Carefully follow all instructions during the LPI Calibration 1 When prompted ty...