ZNS Installation and Operation Manual
Issue 4 12/4/98
GENERAL INFORMATION
The Gamewell Company thanks you for choosing the ZNS Microprocessor based fire alarm control panel.
As with all our products we have taken great care to insure that we have provided a quality product. To
receive maximum benefit and many years of reliable service we would like to make the following
recommendations:
1.
Read this manual carefully
and in it's entirety before proceeding with the installation of the
ZNS panel.
2.
Never
make any connections
with the power connected.
3.
Gamewell spends many hours testing devices that are supplied by Gamewell to be used with
it's control panels to verify compatibility.
To maximize system performance, and minimize
risk of damage to the equipment, we suggest using all Gamewell Components.
4.
There is no substitute for proper maintenance and testing
of this or any life safety
product. Gamewell recommends testing and maintenance of your ZNS in accordance with the
guidelines set forth by the National Fire Protection Association, to be done on a regular basis,
as a minimum.
5.
This manual should be stored with the ZNS panel
for future reference, and should not be
removed, providing reference to the operation and programming of the installed ZNS
Thank you again for choosing Gamewell. If you have any comments regarding your ZNS panel or other
Gamewell products, please feel free to contact us at:
The Gamewell Company
Product Marketing Department
60 Pleasant Street
Ashland, MA 01721
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com