background image

 

Version 3, 31 May 2019, Page 

1

 of 

4

 

Ezy-Drink

®

 Lead Free Remote Bottle Filler 

 

PRODUCT CODES: 
 

-

 

85326X 

 

 

 

 

SPECIFICATIONS

 

 

Lead Free stainless steel construction

 

IMPORTANT: All Ezy-Drink

®

 remote Bottle Fillers are tested in accordance with AS/NZS 3718 and leave our 

premises in good working order. 

 

 

Inlet 

1/2” BSP - Female 

Outlet 

Stainless Steel Gooseneck 

Headwork 

N/A 

Working Pressure Range (kPa)  

Min 

30 

Max 

1000 

Working Temperature Range (°C) 

Min 

Max 

65 

Nominal Flow Rate (LPM) 

N/A 

 

TOOLS REQUIRED

 

  Power drill 

  Wrench 

  2mm Hex Key (provided) 

  Screwdriver

 

 

PRE-INSTALLATION -

 MOUNTING DETAILS

 

 

If the mounting holes do not already exist, mark out and drill the holes in the bench/trough, as shown in the 
rough-in dimensions. 

 

Note: Before installation, all lines must be flushed. We recommend that a line strainer be installed prior to drinking 

taps to eliminate any foreign material. 

 

 
 
 

 

 

 37

 268

 228

LOCKING
SCREW

SEALING
O RING

 34

 90

G 1/2"

Rough-In Dimensions 

Содержание Ezy-Drink 85326X

Страница 1: ... Pressure Range kPa Min 30 Max 1000 Working Temperature Range C Min 2 Max 65 Nominal Flow Rate LPM N A TOOLS REQUIRED Power drill Wrench 2mm Hex Key provided Screwdriver PRE INSTALLATION MOUNTING DETAILS If the mounting holes do not already exist mark out and drill the holes in the bench trough as shown in the rough in dimensions Note Before installation all lines must be flushed We recommend that...

Страница 2: ...ailing to comply with these provisions shall void the product warranty and may affect the performance of the product 1 Fit Stem Drill hole in bench trough as shown in rough in dimensions Fit O Ring to the groove underneath the stem Fit stem through the drilled hole ensuring the O Ring has seated properly 2 Fit Locking Nut Fit and Tighten locking nut until it stops roughly 8mm below the bench troug...

Страница 3: ...tle Filler Fit bottle filler into stem ensuring it is seated correctly Turn the bottle filler to the desired position Once positioned fit and tighten grub screw The bottle filler should no longer turn 5 Test Test installation and check for leaks ...

Страница 4: ...cturer s warranty available for download from www galvinengineering com au Galvin Engineering Pty Ltd expressly warrants that the product is free from operational defects in workmanship and materials for the warranty period as shown on the schedule in the manufacturer s warranty During the warranty period Galvin Engineering will replace or repair any defective products manufactured by Galvin Engin...

Отзывы: