7. 

Fit the inner faceplate into the outer faceplate.  
Ensure the marking on the top of the plate is 
positioned correctly.  

Note:

 Before tightening the flange make sure the handle 

fits correctly. Put screws into flange and tighten finger 
tight, the flange should still be able to move. Slide the 
handle onto spline and move the flange until central to the 
handle. Remove handle and tighten the screws (it is best 
to tighten the screws in sequence a little at a time to avoid 
the flange moving). Refit handle. 

8.

  Fit the handle and fasten so the arrow shape on 

top of the handle matches the marking on the 
faceplate.

 

 

 

11.0 

ADJUSTMENT OF THE MIX TEMPERATURE 

 

 

 

1.  Set the handle to cold position. 

2.  Unscrew the tamper proof 

screw from handle. Pull out 
handle assembly from the 
body

 

3.  Remove the upper brass ring. Make 

sure the   ntr   r d d esn’t r t te 
during the next steps.  

 

 

 

4.  Remove the lower brass ring 

(temperature setting ring) and 
rotate the brass ring 
clockwise to increase 
temperature or anti-clockwise 
to decrease. Refit to spline in 
new position.

 

5.  Reposition the upper ring 

in the same position 
against step.

 

6.  Once set, reverse step 2 to 

reassemble. 

7.  Re-test temperature to ensure correct 

operation. 

 

 

Содержание CliniMix CP-BS

Страница 1: ...s The GalvinCare paddle handle provides straight forward temperature control and minimises ligature risk Suitable for high and low pressure systems with a thermostatically controlled water temperature...

Страница 2: ...e operation provided it is installed commissioned operated and maintained as per the recommendations outlined in this manual It should be noted however that this valve should not be considered as an a...

Страница 3: ...cordance with the provisions of AS NZS 3500 Installations not complying with AS NZS 3500 may void the product and performance warranty provisions 7 0 INSTALLATION The CliniMix Thermostatic Progressive...

Страница 4: ...s a split second it is still considered to be outside the operating conditions and may cause the valve to operate incorrectly In the event that this does occur measures must be taken to control the sp...

Страница 5: ...Before tightening the flange make sure the handle fits correctly Put screws into flange and tighten finger tight the flange should still be able to move Slide the handle onto spline and move the flang...

Страница 6: ...f the outlet temperature requires adjustment then follow the temperature adjustment in the installation instructions Shut Down Test Once the correct outlet temperature has been achieved the valves int...

Страница 7: ...flow to stabilise for at least 15 seconds and record the temperature Quickly isolate the hot water supply to the valve The outlet flow should quickly reduce to be less than 0 4L min following the isol...

Страница 8: ...a time to avoid the flange moving Refit handle 8 Fit the handle and fasten so the arrow shape on top of the handle matches the marking on the faceplate 11 0 ADJUSTMENT OF THE MIX TEMPERATURE 1 Set the...

Страница 9: ...ove cartridge nut and check cartridge Unscrew cartridge and remove from body Check the cartridge for wear and damage Replace if required replacement cartridge available through your supplier Check and...

Страница 10: ...mperature outlet then a 6 monthly servicing cycle may be adopted Otherwise servicing checks should be carried out more frequently e g every 4 months Follow the recommended maintenance procedures detai...

Страница 11: ...aged Raise hot water temperature Clean the cartridge ensuring that all debris is removed Mix temperature unstable Flow rate below 2L min Thermostatic cartridge contains debris or is damaged Strainers...

Страница 12: ...hat system must be in accordance with its m nuf turer s re mmend t n the C de nd re ev nt st tut ry nd t te r Terr t ry requ rements 4 The valve must be returned to Galvin Engineering together with a...

Страница 13: ...Pressure ________kPa Cold Water Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size _________ Valve Location Building ______________________________...

Страница 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Страница 15: ...f Warm Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design fl...

Страница 16: ..._______________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Serv...

Отзывы: