Revision 4
130
April 2020
8.3
QA Document Package Check List and Requirements
Table 34 is completed during the manufacturing process and QA inspection to ensure that the
all relevant operations are performed.
Table 34: Document Package Checklist
Serial Number: _______________
Description
Initial
Date
Sample System Pressure Checked - System Heaters
Sample System Pressure Checked
– Sample System
Purge System Checked
Aspirator Performance Tested
Gas Runs Complete (Calibration Data Sheet)
Temperature Sensor Inputs Checked and Calibrated
Analog Output Calibration Checked
Digital Output Checked
System 24VDC Supply Checked
Span Factor Set
Condenser Solenoid Function Checked
Zero Solenoid Function Checked
Control Cabinet Air Solenoid Function Checked
Operation of Cell Heaters Checked
Burn Oven for three (3) weeks
Cell Pressure Transducer Checked.
Dielectric Strength Test Certificate Completed
Matrix and Cal Documents Completed
Serial Numbers Recorded
Oven Lid Latches Adjusted and Locked
Содержание 943-TGX-CE
Страница 132: ...Revision 4 132 April 2020 Figure 81 Oven Cabinet Door Removed ...
Страница 133: ...Revision 4 133 April 2020 Figure 82 Control Cabinet Door Removed ...
Страница 134: ...Revision 4 134 April 2020 Figure 83 Power Steam Air Signals Connection Details ...
Страница 135: ...Revision 4 135 April 2020 Figure 84 AC Wiring Schematic ...
Страница 136: ...Revision 4 136 April 2020 Figure 85 DC Signals and Wiring Diagram ...
Страница 137: ...Revision 4 137 April 2020 Figure 86 Flow Diagram ...