.
MAINTENANCE
MAINTENANCE PROCEDURE
CHECK BEFORE STARTING
For details of the following items, see "Checks Before Starting (PAGE 3-58)" in the OPERATION section.
Check coolant level, add coolant
Check oil level in engine oil pan, add oil
Check fuel level, add fuel
Check oil level in hydraulic tank, add oil
Check dust indicator
Check water separator
Check electric wiring
Check function of horn
4 - 50
Содержание PC78MR-6
Страница 2: ... 1 1 ...
Страница 4: ... FOREWORD FOREWORD 1 3 ...
Страница 5: ... FOREWORD FOREWORD 1 4 ...
Страница 15: ... ...
Страница 16: ... 2 1 ...
Страница 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Страница 55: ... ...
Страница 56: ... 3 1 ...
Страница 195: ... ...
Страница 196: ... 4 1 ...
Страница 271: ... ...
Страница 272: ... 5 1 ...
Страница 275: ... ...
Страница 276: ... 6 1 ...
Страница 294: ... ...
Страница 295: ... PC78MR 6 GALEO HYDRAULIC EXCAVATOR Form No TEN00074 00 2005 KOMATSU All Right Reserved Printed in Japan 04 05 ...