.
OPERATION
MACHINE OPERATIONS AND CONTROLS
AFTER STARTING ENGINE
WARNING
Emergency stop
If there has been any abnormal action or trouble, turn the starting switch key to the OFF position.
If the work equipment is operated without warming the machine up sufficiently, the response of the work equipment to the
movement of the control lever will be slow, and the work equipment may not move as the operator desires, so always carry out
the warming-up operation, Particularly in cold areas, be sure to carry out the warming-up operation fully.
For operation patterns other than the standard one (ISO pattern), refer to the chapter of ATTACHMENTS AND OPTIONS in this
manual.
Breaking-in the New Machine
CAUTION
Your Komatsu machine has been thoroughly adjusted and tested before shipment. However, operating the machine under severe
conditions at the beginning can adversely affect the performance and shorten the machine life.
Be sure to break-in the machine for the initial 100 hours (as indicated by the service meter).
During break-in operations, follow the precautions described in this manual.
Idle the engine for 5 minutes after starting it up.
Avoid operation with heavy loads or at high speeds.
Immediately after starting the engine, avoid sudden starts, sudden acceleration, unnecessary sudden stops, and
sudden changes in direction.
3 - 77
Содержание PC78MR-6
Страница 2: ... 1 1 ...
Страница 4: ... FOREWORD FOREWORD 1 3 ...
Страница 5: ... FOREWORD FOREWORD 1 4 ...
Страница 15: ... ...
Страница 16: ... 2 1 ...
Страница 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Страница 55: ... ...
Страница 56: ... 3 1 ...
Страница 195: ... ...
Страница 196: ... 4 1 ...
Страница 271: ... ...
Страница 272: ... 5 1 ...
Страница 275: ... ...
Страница 276: ... 6 1 ...
Страница 294: ... ...
Страница 295: ... PC78MR 6 GALEO HYDRAULIC EXCAVATOR Form No TEN00074 00 2005 KOMATSU All Right Reserved Printed in Japan 04 05 ...