4.2.4 Commissioning
Authorised personnel only
Once installation has been completed, check
that the machine is in proper working order:
- turn on the water tap
- switch on the circuit breaker upstream of the
machine
- set the main machine switch to (I) and make
sure the machine ON light turns on.
The machine turns on and the software version
and logo appear on the display.
Menu 1 is displayed next.
The machine's software checks the water level in
the steam boiler, and loads water until the level
probe is reached. Once the level is reached, the
water loading operation stops and the steam
boiler's heating is engaged.
- press the continuous dispensing button on
each unit to eliminate any air present in the
espresso circuit, and fill it completely with
water; This will prevent the espresso boiler
from heating up whilst empty
.
- touch ( ) the centre of the screen to access menu 2
ENG
LA REALE
GENERAL INFORMATION
29
Содержание La Reale
Страница 1: ...INSTALLATION AND USE ...
Страница 6: ...ENG IV CONTENTS ...
Страница 14: ...ENG 8 GENERAL INFORMATION ...
Страница 22: ...ENG 16 GENERAL INFORMATION ...
Страница 25: ...10 A B C 11 7 5 3 D 9 1 8 2 4 6 15 17 A 16 18 19 20 21 B 13 12 D C 14 12 ENG LA REALE GENERAL INFORMATION 19 ...
Страница 29: ...14 3 5 2 10 15 4 6 10 13 11 13 1 8 12 9 7 12 4 A 4 B ENG LA REALE GENERAL INFORMATION 23 ...
Страница 80: ...ENG 74 GENERAL INFORMATION ...
Страница 82: ...ENG 76 GENERAL INFORMATION ...
Страница 83: ...LA REALE ELECTRIC AND HYDRAULIC DIAGRAMS 8 ...
Страница 86: ...ENG 7 PURPLE 7 PURPLE 6 6 6 0 0 0 0 0 0 0 0 0 80 DIAGRAMS ...