– Screw together the air guidance housing and
screw it onto the two retaining brackets (Fig. 25).
– Establish the pipe connection between the air
connection piece and the air guidance housing.
– Establish the electrical connection.
– Stick the included sealing strips (8 strips) around
the air slots on the top chimney paneling.
– Remove the protective foil from the chimney
paneling.
Note:
Avoid damaging the sensitive stainless steel
surfaces.
– Join the chimney shoe with the chimney base
using the 6 screws (3.5 x 9.5 mm) (Fig. 26).
– Fit the top of the chimney into the base. Make
sure that the fastening holes on the side are at the
top.
– Secure the top duct unit with 2 screws on the
ceiling holder.
– Pull the shoe down into its final position
(Fig. 27)
Note:
Avoid scratches when fitting the elements
into one another by placing the assembly template,
for example, over the edge of the bottom chimney
paneling to protect it.
– Make sure that an
activated charcoal filter
is
installed (see page 10).
– Reinsert the grease filters.
– Again screw in the two black plates on the left
and right of the chimney.
– Place the glass plates on the black plates.
5750195808 en 12.00 SK
17
Fig. 25
Fig. 26
Fig. 27