background image

 

 

Instruction manual

 

G-kit® wing

 

 
 

Version: February ‘16 

 

 

 

Содержание G-kit 1200 wing

Страница 1: ...Instruction manual G kit wing Version February 16 ...

Страница 2: ...Detailed specifications pag 5 4 Content boxes pag 7 5 Assembly instructions pag 9 6 Installation Azerwing pag 19 7 Setttings G Kit pag 23 8 Settings Azerwing pag 24 9 Settings ventilator pag 25 9 Maintenance pag 26 10 Frequently asked questions pag 27 11 Service contact pag 27 ...

Страница 3: ...the cabinet 7 Use a thermometer in the shadow to measure the temperature correctly 8 Make sure the ventilation holes are not blocked keep a minimum distance of 10 cm 9 The room in which the G kit is placed needs to be well ventilated Disclaimer G tools has no intention to promote the growing of any specific tropical plant Our products are not meant to encourage anyone to break the law G tools and ...

Страница 4: ...ing PK 125 EC TC 680 m3 hour with temperature setting speed control and acoustic insolated duct Filter 400 600 Wing PK 1603 Industry maximum air flow 460 m3 hour optimal air flow 360 m3 hour Filter 800 1200 Wing PK 1604 Industry maximum air flow 700 m3 hour optimal air flow 460 m3 hour Lighting LuxElite 230V 600Watt Reflector Azerwing Vegagreen with PVD glasscoating Transformer Lucilux electronic ...

Страница 5: ...r box The switchbox consists of the following components Relay 40A Timer Davin 2 x socket for lights 3 x socket for fans irrigation pumps etc All components are CE approved Azerwing We only use the original Azerwing Vegagreen reflector ...

Страница 6: ... extractor fan is an in line fan of Prima Klima It is the most silent in its class 2 Types of in line fans are used GT 2 speed 225m3 360m3 G Kit 400 600 Wing PK 125 EC TC 680 m3 with build in speed controller G Kit 800 1200 Wing ...

Страница 7: ... x air in let box with Azerwing large reflector heavy hanger for mounting Azerwing Box 2 timer box and ballasts side pannel top part with timer box transformers and mounted fittings cable and plug 1 x aluminium profile 110 long for top part 1 x side panel top part 2 x lamp 600W plastick bag with door handles 24 x screw for fixing top part and air in lets Box 3 poles and panels 4 poles 110 cm 4 pol...

Страница 8: ... 8 cm high for bottom part 4 x air inlet 8 x for 800 Wing 2 x aluminium profile with corner pieces box with adjust a wing reflector and chain and spreader box with LexElite 600 Watt bulb 4 door handles with screws Box 2 Poles and panels 4 poles 110 cm 4 small poles 32 cm for bottom part 2 side panels 34 8 cm high for bottom part 2 doors with aluminium profile 2 side panels 112 3 high 2 back panels...

Страница 9: ...ed below is the set up of a G Kit 600 Wing a Open the box and check if all components arrived in good order Take out the large components 2 long panels with vents bottom plate with corner pieces b Take out the other loose components 2 long profiles with corner pieces air inlets ...

Страница 10: ...10 azerwing reflector light bulb c Position the bottom part and make sure it is leveled Push the 4 short poles 32cm on the corner pieces d Take away all the protection foil from the panels ...

Страница 11: ...11 c Place the side panels with the holes for the air inlets 400 600 and 800Wing have holes in back panel d Placet he air inlets Each air inlet consists of 2 parts ...

Страница 12: ...n the backpanel Push part 2 on part 1 and twist lock e Place the back panel and the doors with the supplied wheater tape to seal of the doors lighttight f Take the 2 long profiles with the corner pieces and the 2 side profiles and make a ring ...

Страница 13: ...13 g Position the ring on top of panels of the bottom part push them tight The bottom part is ready h Position the 4 long poles 110cm ...

Страница 14: ...nd put them together using the white H connecting profile j Position the side and back panels between the poles The G Kit 1200 Wing has side panels consisting of two parts picture above is fitted with the optional irrigation system ...

Страница 15: ...15 k Take the doors and add the handles Watch out the door with the white plastic foam is the back door This insulation tape is to make sure no light comes through the doors ...

Страница 16: ...ation instruction G kit 1200 Wing For transport reasons the top part of the G Kit 1200 Wing is packed in three separate boxes a Take the roof panel with the fans and filters from the box and put it flat on the floor ...

Страница 17: ...ing the plastic corner pieces c Attach the opposite side panel using the connectors d Fix the front and back panels between the profiles e Fix the two aluminium profiles 165cm with the connectors f Put the plug of the fan in one of three sockets on the timer box saying continuous ...

Страница 18: ...18 5c Installation instructions Azerwing In the 1200 Wing the Azerwing reflector still has to be installed 400 600 and 800 Wing models have the Azerwing pre installed ...

Страница 19: ...rwing out of the box and check the content b Install the Azerwing reflector according to the supplied manual c Connect the fittings of the Azerwing to the cables of the two Lucilux ballasts Don t forget to ground them ...

Страница 20: ...the Wing the reflector can be adjusted from wide to deep beam d Take the heavy hangers and hook it between the wing and the upper part of the cabinet When everything is installed properly the upper part can be placed on top of the poles ...

Страница 21: ...not the profile is dirty or bent g Push the top downwards till all the panels are locked up h Put in the plug and the G kit is ready to use i The fan runs permanently as soon as the plug is connected All the settings are explained in the next chapter 6 The Timer box The timer box picture below contains a relay and a timer The sockets on the left side are for the lights and are switched on and off ...

Страница 22: ...he timer a Put the timer on b Set the time by turning the at current time c The green pins in the outer ring mean Positioned outside ON Positioned inside OFF Set the timer for lights ON by pushing the pins outwards ...

Страница 23: ...ning the stays with The screws The wing now reflects a narrow beam and the reflector can be hung high above the canopy After the 2nd week Widen the reflector with the screws on the stays The light will be beamed over a wider angle and the reflector can be hung lower above the canopy ...

Страница 24: ...er fine tune the running speed of the fan NOTE Make sure that the fan runs fast enough to maintain under pressure when the lights are off Example Temperature setting 25 C Minimum speed setting 75 When the temperature rises above 25 C the fan will run at full speed 680M 3 hour When it drops below 25 C the fan speed will slowly fall back to 75 of it s full capacity 510 m3 hour Tip Put the censor whe...

Страница 25: ... major activated carbon filter ACF killers NO 1 cigarette smoke Never smoke near an ACF Cigarette smoke is the strongest service life reducer of the activated carbon NO 2 moisture The activated carbon no longer works with humidity over 85 No reaction can take place in the filter therefore the air is not neutralised NO 3 dirt Dirt particles damage and block the activated carbon pore openings whereb...

Страница 26: ...pecially in the beginning it is important the plant get enough water To spray them with water in the first two weeks is the best Is it possible to put a G kit in a barn or garage No problem make sure there is enough fresh air and keep it warm in the winter Do I get warranty There s a one year warranty on all electrical equipment except for the light bulb and filter New parts shall be send to you a...

Отзывы: