2
FLATLINE VAN CO • [email protected] • 888-667-5576
THANK YOU!
ARE YOU EXCITED ABOUT YOUR NEW TIRE CARRIER? HERE ARE A FEW THINGS TO
DO BEFORE BEGINNING THE INSTALLATION PROCESS--
• PLEASE INSPECT THE PRODUCT TO ENSURE THERE WAS NO
DAMAGE INCURRED DURING SHIPPING.
• IF THERE IS DAMAGE TO REPORT, PLEASE CONTACT OUR
CUSTOMER SERVICE DEPARTMENT AS SOON AS POSSIBLE.
• NEXT, USING THE “PACKAGE CONTENTS” PAGE, CHECK
INVENTORY AND FAMILIARIZE YOURSELF WITH THE PARTS
AND HARDWARE.
• GATHER ALL TOOLS REQUIRED FOR INSTALL.
-9/16 BOX WRENCH
-9/16 DEEP SOCKET
-3/4 BOX WRENCH OR SOCKET
-7/32 HEX KEY ALLEN WRENCH
-5MM HEX KEY ALLEN WRENCH
-3/16 DRILL BIT
-1/4 DRILL BIT
-3/8 DRILL BIT
-POWER
DRILL
-
RED LOCTITE
ESTIMATED INSTALL TIME- 2 HRS
ADDITIONAL HELP IS SUGGESTED FOR A FEW OF THE INSTALL STEPS.
TOOLS
7/32 ALLEN KEY
9/16 WRENCH 3/4 WRENCH
RATCHET
9/16
9/16 DEEP
SOCKET
13/16
13/16 DEEP
SOCKET
5MM ALLEN KEY