35
4) Cover upper radome and fix 12 pcs of M10x35
bolt which remains on the bottom radome with
fall prevention structure.
5) Protective tube connection
Every location must have to measure a length in between ATU
SPU
DPU for adjusting the
length of protective tube.
Signal Processing Unit
4.3.
1) Fix SPU on the ground or fixed channel base
using M10 bolt and nut x4pcs.
2) SPU condition at delivery.
12xM10 Stopper Bolt
Open/Close radome
ATU
DPU
(Indoor)
. Spare
SPU
Top view of SPU
M10 bolt
M10 bolt
In a case of using
M10 bolt and nut
to fix on stand.
USB cable
Coaxial cable
PXI CONT
LAN cable
Power cable
PXI
Содержание WR2120
Страница 1: ...INSTALLATION MANUAL WEATHER RADAR MODEL WR2120 www furuno com...
Страница 52: ...46 6 OUTLINE DRAWING 1 Antenna Unit...
Страница 53: ...47 2 Signal Processing Unit...
Страница 54: ...48 3 Data Processing Unit...
Страница 55: ...49 4 Data Processing Unit Power Supply...