![Furuno FCV-38 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/furuno/fcv-38/fcv-38_installation-manual_2349640031.webp)
2. WIRING
2-11
If a pre-installed transducer has a cable with a diameter 19.4 mm (in this case,
transducer cable with the data sticker in “white”)
, wind the conductive tape sup-
plied in CP02-09801 around the center of the shielded section of the cable. If a con-
ductive tape supplied locally is used, keep in mind the following points:
• Tape size: width 25 mm
×
length 600 mm
• Conductive copper tape on the adhesive surface
Note:
For the cables with a diameter 22.0 mm, conductive tape is not required.
2.5
Junction Box (option)
Connect the ground wire between the ground terminal on the chassis and the ship’s
earth, referring to section 1.5.
How to open/close the top cover
Unfasten four screws to open the top cover from the
junction box.
After the appropriate cable connections are completed,
replace the cover then fasten the four screws.
Cable Connection
Unfasten the four screws on the cable clamps, pass the cables (from the transceiver
and transducer) through the clamps. Connect the cables to their respective connec-
tors in the Junction Box. Fasten the four screws to secure the cables with the clamps.
Conductive tape
Содержание FCV-38
Страница 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Страница 58: ...3 INITIAL SETTINGS 3 24 This page is intentionally left blank ...
Страница 66: ...D 1 9 Sep 2019 H MAKI ...
Страница 67: ...D 2 3 Aug 2020 H MAKI ...
Страница 68: ...D 3 3 Oct 2019 H MAKI ...
Страница 69: ...D 4 26 Sep 2019 H MAKI ...
Страница 70: ...D 5 14 Jun 2018 H MAKI ...
Страница 71: ...D 6 14 Jun 2018 H MAKI ...
Страница 72: ...D 7 14 Jun 2018 H MAKI ...
Страница 73: ...D 8 Jun 10 05 ...
Страница 74: ...D 9 ...
Страница 75: ...Oct 22 07 R Esumi D 10 ...
Страница 76: ...D 11 9 Oct 2019 H MAKI ...
Страница 77: ...D 12 9 Oct 2019 H MAKI ...
Страница 78: ...D 13 11 Mar 2010 Y NISHIYAMA ...
Страница 79: ...D 14 15 Apr 2020 H MAKI ...