![Furuno DS-8500 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/furuno/ds-8500/ds-8500_installation-manual_2349987022.webp)
1. MOUNTING
1-16
DS-854 (Ball valve, Transducer)
Note 1:
The liquid gasket for installation may not be supplied due to export regula-
tions. If the liquid gasket TB1121 is not included in the installation materials, prepare
the liquid gasket specified in your country.
Note 2:
The ball valve requires service space of 700 mm. For details, see the instal-
lation drawing at the back of this manual.
1. Unfasten M16 nut (10) and flat washer (11) from the assembled gate valve to re-
move the five items shown below.
• Ball valve (20)
• Flange (3)
• Gasket 1(18)
• Gasket 2(18)
• Shaft assy.
2. Set the flange (3) to the mounting location.
The “FORE-AFT” line on the spacer must be parallel with the ship’s fore and aft
line (within1). For horizontal direction, the bottom of the spacer must be parallel
with the ship’s draft.
2
5
12
4
21
6
17
1
3
18
18
20
13 14
13 14
10 11
9 10 11
7 8 19
15 16
13 14
Ball valve DS-854
(Sectional view)
Shaft assy.
Gasket 2(18)
Gasket 1(18)
Ball valve (20)
Flange (3)
Waterproof
surface
(dash-dotted
line)
Содержание DS-8500
Страница 81: ...D 1 28 Sep 2019 H MAKI ...
Страница 82: ...D 2 28 Sep 2019 H MAKI ...
Страница 83: ...D 3 29 Oct 2019 H MAKI ...
Страница 84: ...D 4 18 Feb 2020 H MAKI ...
Страница 85: ...D 5 3 Apr 2020 H MAKI ...
Страница 86: ...D 6 6 Apr 2020 H MAKI ...
Страница 87: ...D 7 2 Apr 2020 H MAKI ...
Страница 88: ...D 8 ...
Страница 89: ...D 9 ...
Страница 90: ...D 10 ...
Страница 91: ...D 11 17 Nov 2016 H MAKI ...
Страница 92: ...D 12 25 May 2011 Y NISHIYAMA ...
Страница 93: ...D 13 15 May 2020 H MAKI ...