
AP-1
CALIBRATION
Milepost run
It is common practice to check a new ship's performance at an official trial run. Take this
opportunity to calibrate the DS-80.
In practice, the ship speed is evaluated as follows.
1. Calculation with transit posts
Steer the ship at a steady speed on the test course, e.g. A
o
B in the illustration. Speed is
obtained from the following equations. Note that Sg1 and Sg2 are both speeds over the ground
(SOG); however the DS-80 provides the speed through the water. To find the speed though the
water, a return trip is necessary.
P1
P1'
P2
P2'
A
B
Sg1 = d/t1 X 3600 (kn)………(1)
Sg2 = d/t2 X 3600 (kn) ………(2)
Sw + St = Sg1 (kn) ……… (3)
Sw - St = Sg2 (kn) ……… (4)
Adding (4) and (3), we get;
2SW = Sg1 + Sg2 (kn)
Therefore, Sw = (Sg1 + Sg2)/2 (kn)…… (5)
where,
d = distance run (NM),
Содержание DS-80
Страница 4: ...ii SYSTEM CONFIGURATION ...
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ...Sep 09 03 D 5 ...
Страница 60: ...Y Hatai D 6 ...
Страница 61: ......
Страница 62: ...D 8 ...
Страница 63: ...D 9 ...
Страница 64: ...D 10 16 Dec 2016 H MAKI ...
Страница 65: ...D 11 16 Dec 2016 H MAKI ...
Страница 66: ...D 12 21 Dec 2016 H MAKI ...
Страница 67: ...D 13 21 Dec 2016 H MAKI ...
Страница 68: ...D 14 ...
Страница 69: ...23 Oct 08 R Esumi D 15 ...
Страница 70: ...D 16 12 Apr 2019 H MAKI ...
Страница 71: ...D 17 ...
Страница 72: ...D 18 ...
Страница 73: ...D 19 ...
Страница 74: ...D 20 17 Nov 2016 H MAKI ...
Страница 75: ...D 21 25 May 2011 Y NISHIYAMA ...
Страница 76: ...D 22 15 May 2020 H MAKI ...
Страница 77: ...D 23 ...
Страница 78: ...D 24 ...
Страница 79: ...D 25 13 May 2020 H MAKI ...
Страница 80: ...D 26 1 Nov 2011 Y NISHIYAMA ...
Страница 81: ...D 27 1 Nov 2011 Y NISHIYAMA ...
Страница 82: ...D 28 22 Dec 2016 H MAKI ...